Marlin Balmore Hernandez

Contractor license
1029066
State license record
Based in
Richmond
On San Francisco permits
Aug 2017 to Apr 2024
Last 24 months
0 permits filed

6 permits since 2000: 5 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllStairs 1Kitchen remodel 3Bathroom remodel 3

3 kitchen remodel permits: 3 completed. Typically 14 days from filing to permit and 308 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 6, 2024Completed
final sign-off Dec 2024
257 Silver Avremove lightwells and expand kitchen on 2nd fl. add one bathroom on 2nd fl. rebuild interior stair between first and second fl
Details
Permit
202402065341
Status
complete
Filed
Feb 6, 2024
Permit issued
Feb 20, 2024
Final sign-off
Dec 24, 2024
Declared cost
$80,000
Address
257 Silver Av

remove lightwells and expand kitchen on 2nd fl. add one bathroom on 2nd fl. rebuild interior stair between first and second fl

Open the permit page

$80,000
Jul 3, 2018Completed
final sign-off Feb 2019
1977 Pine Stinterior alteration: replace floors, paint walls, renovate kitchen and bathrooms. no exterior work
Details
Permit
201807033611
Status
complete
Filed
Jul 3, 2018
Permit issued
Jul 3, 2018
Final sign-off
Feb 15, 2019
Declared cost
$105,000
Address
1977 Pine St

interior alteration: replace floors, paint walls, renovate kitchen and bathrooms. no exterior work

Open the permit page

$105,000
Aug 11, 2017Completed
final sign-off Nov 2018
1979 Pine Stinterior alteration: layout change,remove/replace all interior wall finishes,flooring,fixtures,interior doors;remodel kitchen & baths. legalize layout changes in grd.flr.rumpus rm.;replace electric baseboard heating by forced air system;tankless water heater
Details
Permit
201708114590
Status
complete
Filed
Aug 11, 2017
Permit issued
Oct 18, 2017
Final sign-off
Nov 20, 2018
Declared cost
$185,000
Address
1979 Pine St

interior alteration: layout change,remove/replace all interior wall finishes,flooring,fixtures,interior doors;remodel kitchen & baths. legalize layout changes in grd.flr.rumpus rm.;replace electric baseboard heating by forced air system;tankless water heater

Open the permit page

$185,000