Back to kitchen remodel contractors
Markison Pierce Co
- Based in
- Novato
- On San Francisco permits
- Aug 2008 to Jan 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2008 | Never finaled issued Aug 2008, no final | 509 Pennsylvania Av | kitchen remodel- replace cabinets, countertops, plumbing fixtures, sink oven and microwave-all in the same location as existing. new lighting to be installed using existing circuits to comply with title 24. no structural work.Details
kitchen remodel- replace cabinets, countertops, plumbing fixtures, sink oven and microwave-all in the same location as existing. new lighting to be installed using existing circuits to comply with title 24. no structural work. | $25,000 |