Mark Sluka Construction
- Based in
- Piedmont
- On San Francisco permits
- Nov 2002 to May 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2021 | Never finaled issued Dec 2021, no final | 965 Clay St | installation of temporary walls in 1st fl gallery, install suspended ridding pipe in 1st fl. new electrical outlet at exhibt walls and suspended lighting pipes. accessibility upgrade: replace 2 toilets, 2 sinks, install handrail at 2 stairs, and accessible signage.Details
installation of temporary walls in 1st fl gallery, install suspended ridding pipe in 1st fl. new electrical outlet at exhibt walls and suspended lighting pipes. accessibility upgrade: replace 2 toilets, 2 sinks, install handrail at 2 stairs, and accessible signage. | $107,000 |