Back to kitchen remodel contractors
Mark Brockley Construction
- Based in
- Forest Knolls
- On San Francisco permits
- May 2005 to Sep 2024
- Last 24 months
- 0 permits filed
56 permits since 2000: 36 completed, 2 in progress, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 15 completed, 6 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2024 | Completed final sign-off Dec 2024 | 1483 34th Av | revision to pa# 202406174617 (no plan, kitchen remodel). remove wall between kitchen & dining room on 2nd fl and add new posts and beam.Details
revision to pa# 202406174617 (no plan, kitchen remodel). remove wall between kitchen & dining room on 2nd fl and add new posts and beam. | $5,000 |
| Jun 17, 2024 | Completed final sign-off Dec 2024 | 1483 34th Av | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $45,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 321 Church St | add new skylight in the kitchen. flat roof.Details
add new skylight in the kitchen. flat roof. | $5,000 |
| Jun 12, 2023 | Completed final sign-off Apr 2024 | 321 Church St | remove and replace drywall at entry stairs. install 2 light fixtures on existing switch. install 2 outlets in kitchen and 2 light fixtures in kitchen.Details
remove and replace drywall at entry stairs. install 2 light fixtures on existing switch. install 2 outlets in kitchen and 2 light fixtures in kitchen. | $10,500 |
| Jan 4, 2023 | Completed final sign-off Jun 2023 | 331 Amazon Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $82,000 |
| May 2, 2022 | Completed final sign-off Nov 2022 | 1078 Florida St | remodel (e) kitchen and bathroom @ 2nd fl. remove load bearing wall between kitchen and dining. add new posts and beams. no exterior work.Details
remodel (e) kitchen and bathroom @ 2nd fl. remove load bearing wall between kitchen and dining. add new posts and beams. no exterior work. | $45,000 |
| Nov 25, 2020 | Completed final sign-off Jun 2021 | 114 Bridgeview Dr | kitchen and bath remodel as existing layout. no wall framing changes.Details
kitchen and bath remodel as existing layout. no wall framing changes. | $110,000 |
| May 15, 2020 | Completed final sign-off Jun 2020 | 151 23rd Av | remove and replace kitchen with no change to wall framing. (tile, countertops, cabinetry, appliances, paint) in kindDetails
remove and replace kitchen with no change to wall framing. (tile, countertops, cabinetry, appliances, paint) in kind | $32,000 |
| Nov 6, 2019 | Completed final sign-off Jun 2020 | 3934 Clay St | new kitchen counters over existing cabinets 2 remodeled bathrooms.Details
new kitchen counters over existing cabinets 2 remodeled bathrooms. | $150,000 |
| Jul 23, 2018 | Completed final sign-off Feb 2019 | 3555 Jackson St | 1 kitchen - cabinets counters paint ele. 2 bathrooms - tile cabinets plm fixtures ele 1 laundry - plm & ele replacementDetails
1 kitchen - cabinets counters paint ele. 2 bathrooms - tile cabinets plm fixtures ele 1 laundry - plm & ele replacement | $109,250 |
| Apr 19, 2018 | Never finaled issued Jul 2018, no final | 1000 Mason St | #904: remodel kitchen - new kitchen cabinets and lighting, remodel bathroom - new shower valve in bathroom. no walls changedDetails
#904: remodel kitchen - new kitchen cabinets and lighting, remodel bathroom - new shower valve in bathroom. no walls changed | $18,000 |
| Feb 20, 2018 | Expired or cancelled expired Jan 2020 | 403 Broderick St | to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry.Details
to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry. | $20,000 |
| Dec 21, 2017 | Completed final sign-off Jul 2018 | 142 Midcrest Wy | interior remodel: 2/f: remodel (e) kitchen & bathroom. 1/f remodel (e) bathroom. convert (e) garage to home office.Details
interior remodel: 2/f: remodel (e) kitchen & bathroom. 1/f remodel (e) bathroom. convert (e) garage to home office. | $85,000 |
| Jul 18, 2016 | Expired or cancelled expired Jun 2022 | 2801 Jackson St | kitchen remodel - new cabinets, lighting, appliances, plumbing fixtures, counters. no alteration of wall, window or door.Details
kitchen remodel - new cabinets, lighting, appliances, plumbing fixtures, counters. no alteration of wall, window or door. | $41,600 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 358 Dolores St | kitchen remodel - new cabinets, lighting, appliances, plumbing fixtures, counters. no alteration of wall, window or door.Details
kitchen remodel - new cabinets, lighting, appliances, plumbing fixtures, counters. no alteration of wall, window or door. | $34,600 |
| Jun 3, 2016 | Never finaled issued Jul 2016, no final | 1077 Portola Dr | remodel existing kitchen, raise kitchen cabinets ceiling by 2'-0"; new 2nd floor deck @ 1'-6" from grade & doors from rear bedrooms; 1st fl garage: buildout bedroom, bathroom, den, office, laundry room. adding additional 971 sq ft. including deckDetails
remodel existing kitchen, raise kitchen cabinets ceiling by 2'-0"; new 2nd floor deck @ 1'-6" from grade & doors from rear bedrooms; 1st fl garage: buildout bedroom, bathroom, den, office, laundry room. adding additional 971 sq ft. including deck | $175,000 |
| Sep 30, 2013 | Completed final sign-off Apr 2014 | 1000 Mason St | unit 201: remodel (e) kitchen & four bathrooms as existing. new tile & fixtures. no structural changes. bring electrical & plumbing up to code (electrical & plumbing constractors to pull separate permit). comply with smoke alarms & co2 alarms per cbc-2010.Details
unit 201: remodel (e) kitchen & four bathrooms as existing. new tile & fixtures. no structural changes. bring electrical & plumbing up to code (electrical & plumbing constractors to pull separate permit). comply with smoke alarms & co2 alarms per cbc-2010. | $45,000 |
| Apr 16, 2013 | Completed final sign-off Nov 2015 | 1000 Mason St | kitchen: remove and replace cabinets, counters, lighting (no structural or layout changes). bath 1: remove existing tile and plumbing fixtures and replace (no structural or layout changes. bath 2; remove existing tile and plumbing fixtures.Details
kitchen: remove and replace cabinets, counters, lighting (no structural or layout changes). bath 1: remove existing tile and plumbing fixtures and replace (no structural or layout changes. bath 2; remove existing tile and plumbing fixtures. | $45,000 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 1055 California St | remodel existing bathroom & kitchen at apt# 6 only - inkind, replace cabinets & fixtures. no structural changesDetails
remodel existing bathroom & kitchen at apt# 6 only - inkind, replace cabinets & fixtures. no structural changes | $20,000 |
| Dec 21, 2012 | Never finaled issued Jan 2013, no final | 1000 Mason St | interior remodel of #903: new partition walls & remodel of existing bathroom and kitchen. mech and elec under separate permitDetails
interior remodel of #903: new partition walls & remodel of existing bathroom and kitchen. mech and elec under separate permit | $15,000 |
| Mar 30, 2012 | Expired or cancelled expired Jul 2014 | 1000 Mason St | remodel #303 & 308 interior remodel only. remove partition walls. new walls remodel kitchen and bathrooms. upgrade existing shaft to two hours at remodel units- no structural wall.Details
remodel #303 & 308 interior remodel only. remove partition walls. new walls remodel kitchen and bathrooms. upgrade existing shaft to two hours at remodel units- no structural wall. | $60,000 |
| Jan 4, 2012 | Never finaled issued Jan 2012, no final | 1055 California St | work in unit #2: new kitchen counters and appliances into (e) layout. painting of kitchen. smoke detectors at bedroom & at hall outside bedrooms.Details
work in unit #2: new kitchen counters and appliances into (e) layout. painting of kitchen. smoke detectors at bedroom & at hall outside bedrooms. | $10,000 |
| Feb 25, 2011 | Completed final sign-off Apr 2012 | 1055 California St | remodel (e) apt #9-new partition walls, remove (e) partition walls, remodeling (e) kitchen & bathrooms; lighting to comply with cec 150(k)Details
remodel (e) apt #9-new partition walls, remove (e) partition walls, remodeling (e) kitchen & bathrooms; lighting to comply with cec 150(k) | $20,000 |
| Feb 24, 2011 | Completed final sign-off Mar 2012 | 1055 California St | remodel existing apt 16. new partition walls. remove existing partition walls. remodeling e kitchen and bath (4)Details
remodel existing apt 16. new partition walls. remove existing partition walls. remodeling e kitchen and bath (4) | $20,000 |