Back to bathroom remodel contractors
Mario Sarmento
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2026
- Last 24 months
- 10 permits filed
108 permits since 2000: 65 completed, 10 in progress, 15 never finaled, 18 expired or cancelled.
Of the 15 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 20 completed, 2 in progress, 4 never finaled, 4 expired or cancelled. Typically 22 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 3720 23rd St | add conditioned space to (e) basement, add two bedroom, bath and media room. ref#: 202106091991.Details
add conditioned space to (e) basement, add two bedroom, bath and media room. ref#: 202106091991. | $21,000 |
| Sep 24, 2025 | In progress issued Oct 2025 | 573 10th Av | interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs.Details
interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs. | $75,000 |
| Jun 22, 2022 | Never finaled issued Oct 2022, no final | 210 Frederick St | update two unit's kitchens, remodel primary bed & bath, remodel other bathrooms, add dorrmer per za-bulletin no.3; replace doors & windows per plan. fence under defferred permitDetails
update two unit's kitchens, remodel primary bed & bath, remodel other bathrooms, add dorrmer per za-bulletin no.3; replace doors & windows per plan. fence under defferred permit | $200,000 |
| Nov 10, 2021 | Completed final sign-off Aug 2024 | 1457 23rd Av | interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door.Details
interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door. | $250,000 |
| Jun 9, 2021 | Expired or cancelled suspend Jul 2026 | 3720 23rd St | add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor.Details
add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor. | $350,000 |
| Apr 13, 2021 | Completed final sign-off May 2022 | 1350 Filbert St | relocate & remodel (e) bathroom within building envelope. replace 1 non-street visible sliding door at (e) bedroom with double glazed marvin clad or equivalent single door & sidelite.Details
relocate & remodel (e) bathroom within building envelope. replace 1 non-street visible sliding door at (e) bedroom with double glazed marvin clad or equivalent single door & sidelite. | $30,000 |
| Oct 31, 2020 | Completed final sign-off Sep 2021 | 1344 Filbert St | remodel (e) bathroom within (e) bldg envelope. replace 1 non-street visible window at lightwell with double glazed fleetwood windows with thermal break aluminum frames.Details
remodel (e) bathroom within (e) bldg envelope. replace 1 non-street visible window at lightwell with double glazed fleetwood windows with thermal break aluminum frames. | $20,000 |
| Mar 12, 2019 | Completed final sign-off Sep 2019 | 715 Marina Bl | add bath fan to 2nd story bath. vent thru roofDetails
add bath fan to 2nd story bath. vent thru roof | $1,000 |
| Nov 21, 2018 | Never finaled issued Feb 2023, no final | 762 Duncan St | horizontal & vertical addition, new 3rd floor, family room, bath, laundry at 1st fl, remodel living room, kitchen, new interior stair, new deck at 2nd & 3rd fl, two bedroom, bath at 3rd floor.Details
horizontal & vertical addition, new 3rd floor, family room, bath, laundry at 1st fl, remodel living room, kitchen, new interior stair, new deck at 2nd & 3rd fl, two bedroom, bath at 3rd floor. | $725,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2019 | 715 Marina Bl | interior remodel at 3rd story above garage. remodel (e) bath & bedroom. no structual change. no change to parking. replace (e) exterior doors & windows with new sliding door.Details
interior remodel at 3rd story above garage. remodel (e) bath & bedroom. no structual change. no change to parking. replace (e) exterior doors & windows with new sliding door. | $50,000 |
| Mar 24, 2017 | Completed final sign-off Jan 2018 | 775 28th Av | 2nd story remodel including 2 bathrooms, replace front 1st & 2nd story windows and 1 side window. no added floor area, no change of occupancy, # of units or plmg fixtures, or parking. no structural changes.Details
2nd story remodel including 2 bathrooms, replace front 1st & 2nd story windows and 1 side window. no added floor area, no change of occupancy, # of units or plmg fixtures, or parking. no structural changes. | $30,000 |
| Apr 26, 2016 | Completed final sign-off Apr 2017 | 4525 19th St | interior demo less than 75%. remodel of kitchen and bathroom at 3rd story. no change of occupancy, no change of parking, no change of bldg area. front windows, replace in kind w/ dbl hung wood. no expansion of bldg or roofline.Details
interior demo less than 75%. remodel of kitchen and bathroom at 3rd story. no change of occupancy, no change of parking, no change of bldg area. front windows, replace in kind w/ dbl hung wood. no expansion of bldg or roofline. | $50,000 |
| Mar 10, 2014 | Completed final sign-off Dec 2015 | 328 Hill St | interior remodel of existing basement bedroom and full bath. legalize existing basement.Details
interior remodel of existing basement bedroom and full bath. legalize existing basement. | $150,000 |
| Mar 5, 2014 | Completed final sign-off Apr 2018 | 4519 19th St | front bldg: 2 story vertical addition over (e) 1 story - no change of occupancy, # of units or parking (totally will become 3.5 baths plus 3 bedrms with dining/living/and 1 kitchen),itemized as: 1 bath on 1/fl, 3 bedrooms on 2/fl plus 2baths, 1/2 bath w/ dining/living & 1 kitchen on 3/fl.Details
front bldg: 2 story vertical addition over (e) 1 story - no change of occupancy, # of units or parking (totally will become 3.5 baths plus 3 bedrms with dining/living/and 1 kitchen),itemized as: 1 bath on 1/fl, 3 bedrooms on 2/fl plus 2baths, 1/2 bath w/ dining/living & 1 kitchen on 3/fl. | $150,000 |
| Feb 19, 2014 | Completed final sign-off Sep 2014 | 3440 Clay St | partial remodel of 4th story of residential unit. no changes to occupancy ,exiting, parking or bath number. expansion of terrace @ front of property. compliance with ordinance #155-13 not requiredDetails
partial remodel of 4th story of residential unit. no changes to occupancy ,exiting, parking or bath number. expansion of terrace @ front of property. compliance with ordinance #155-13 not required | $50,000 |
| Aug 22, 2013 | Completed final sign-off Sep 2013 | 366 Hill St | revision to appl #200911131246 & #2012.09.05.8946 - to show storage not bedroom & bath on ground floor.Details
revision to appl #200911131246 & #2012.09.05.8946 - to show storage not bedroom & bath on ground floor. | $100 |
| Jun 5, 2013 | Completed final sign-off Jul 2014 | 775 28th Av | 3rd story interior remodel. addition of terraces over e roofs. remodel 3rd fl bath, new closet in bedrooms, remove closet in media room. no change of occupancy, floor area, number of units, plumbing or parking + new wood clad windows & smooth painted stucco finishDetails
3rd story interior remodel. addition of terraces over e roofs. remodel 3rd fl bath, new closet in bedrooms, remove closet in media room. no change of occupancy, floor area, number of units, plumbing or parking + new wood clad windows & smooth painted stucco finish | $75,000 |
| Jan 11, 2013 | Completed final sign-off Sep 2014 | 3440 Clay St | remodel 3 bathrooms on 3rd story 2 unit building. upgrade wiring and lighting under separte permit. replace crown moulding throughout. remove e non conforming kitchen and partitionDetails
remodel 3 bathrooms on 3rd story 2 unit building. upgrade wiring and lighting under separte permit. replace crown moulding throughout. remove e non conforming kitchen and partition | $35,000 |
| Mar 16, 2011 | Completed final sign-off Aug 2011 | 130 Laidley St | renovation of existing bathroom in existing space. no change to exterior. new fixtures tile, cabinets, fan and heater. new skylight greater than 5 feet to propertyline,Details
renovation of existing bathroom in existing space. no change to exterior. new fixtures tile, cabinets, fan and heater. new skylight greater than 5 feet to propertyline, | $16,000 |
| Mar 15, 2011 | Completed final sign-off Jul 2011 | 616 03rd Av | kitchen and bath remodel. same location, no walls moved. replace old aluminum sliding door with new ( not visible forom street) replace single glazed glass ( not tempered) with double glazed ( now visible from streetDetails
kitchen and bath remodel. same location, no walls moved. replace old aluminum sliding door with new ( not visible forom street) replace single glazed glass ( not tempered) with double glazed ( now visible from street | $30,000 |
| Feb 17, 2011 | Completed final sign-off Jul 2011 | 2170 Vallejo St | bathroom remodel: replace old with new fixtures, install new vanity, re-tile shower walls and floor, (note: master bathroom)Details
bathroom remodel: replace old with new fixtures, install new vanity, re-tile shower walls and floor, (note: master bathroom) | $15,000 |
| Jan 13, 2009 | Never finaled issued May 2009, no final | 656 Arkansas St | new garage, rebuild (e) entry stairs, new bathroom in (e) workplaceDetails
new garage, rebuild (e) entry stairs, new bathroom in (e) workplace | $80,000 |
| Jul 17, 2006 | Completed final sign-off Dec 2006 | 3750 Clay St | add new bathroom in existing closet - no walls to be moved - all existing - change door and skylite on 3rd floor.Details
add new bathroom in existing closet - no walls to be moved - all existing - change door and skylite on 3rd floor. | $15,000 |
| Dec 6, 2005 | Completed final sign-off Dec 2006 | 601 Van Ness Av | unit #1105 only-full kitchen remodel&2 bathroom remodel.mew c;psets dpprs slo, [aomt wa;;s. [aomt. mew built-in units in bedroom & office electrical. add outlets & lights throughout apt.Details
unit #1105 only-full kitchen remodel&2 bathroom remodel.mew c;psets dpprs slo, [aomt wa;;s. [aomt. mew built-in units in bedroom & office electrical. add outlets & lights throughout apt. | $80,000 |
| Sep 29, 2003 | Expired or cancelled expired May 2004 | 582 30th Av | remodel bath and powder room. new fixture tile and cabinets. no structural workDetails
remodel bath and powder room. new fixture tile and cabinets. no structural work | $20,000 |
| Jan 29, 2002 | Never finaled issued Jan 2002, no final | 3071 California St | kitchen and bath remodel reconfign of back of the house, partition walls removed frm existing kitcheDetails
kitchen and bath remodel reconfign of back of the house, partition walls removed frm existing kitche | $100,000 |
| Jul 17, 2001 | Expired or cancelled expired Apr 2003 | 67 San Leandro Wy | remodel master & hall bath (all new fixtures)Details
remodel master & hall bath (all new fixtures) | $30,000 |
| Jan 16, 2001 | Completed final sign-off May 2001 | 4141 23rd St | bathroom and kchn remodelDetails
bathroom and kchn remodel | $25,000 |
| Oct 18, 2000 | Completed final sign-off Mar 2001 | 92 Saturn St | 2 bathrooms to be remolded 2 vanitys 1 shower, 1 tub, 2 toilets, tile and pain no structral workDetails
2 bathrooms to be remolded 2 vanitys 1 shower, 1 tub, 2 toilets, tile and pain no structral work | $20,000 |
| Mar 3, 2000 | Expired or cancelled expired Sep 2000 | 636 Broderick St | bathroom remodelingDetails
bathroom remodeling |