Mario Avila Construction
- Based in
- Concord
- On San Francisco permits
- Oct 2002 to May 2012
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2005 | Expired or cancelled expired Jan 2010 | 2011 Golden Gate Av | repair dryrot at back of bldg dryrot 2nd floor back room 1st floor at footing/3rd floor below back deck/no more than 1/3 of the areaDetails
repair dryrot at back of bldg dryrot 2nd floor back room 1st floor at footing/3rd floor below back deck/no more than 1/3 of the area | $10,000 |
| Aug 16, 2005 | Completed final sign-off Oct 2005 | 2400 41st Av | remove stucco at deck and front wall of bldng to final out extent of moisture damge-termite report nDetails
remove stucco at deck and front wall of bldng to final out extent of moisture damge-termite report n | $500 |