Block 2385, lot 042A
2400 41st Ave
- City’s use
- Multi-Family Residential
- Built
- 1945
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,050 sq ft
- Lot
- 1,437 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2022 | Never finaled filed Mar 2022, never issued | 2400 41st Av | addition of one adu unit at the first floor under the state adu program.Details
addition of one adu unit at the first floor under the state adu program. | $50,000 | |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 2400 41st Av | Yao Star Construction | install scaffolding to fix the rear windows leak. and fix stucco leak and paint the rear wall.Details
install scaffolding to fix the rear windows leak. and fix stucco leak and paint the rear wall. | $3,500 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 2400 41st Av | Yao Star Construction | remodel kitchen and 1 full bathroom at second floorDetails
remodel kitchen and 1 full bathroom at second floor | $20,000 |
| Nov 1, 2018 | Expired or cancelled withdrawn Mar 2022 | 2400 41st Av | add two bedrooms and 1 bathroom on 1st floorDetails
add two bedrooms and 1 bathroom on 1st floor | $60,000 | |
| May 25, 2018 | Expired or cancelled withdrawn Dec 2021 | 2400 41st Av | legalize one dwelling unit (unit c) on 1st flr w/ 2 bedrooms, one full bath, one kitchen, dining & living room per ord 43-14.Details
legalize one dwelling unit (unit c) on 1st flr w/ 2 bedrooms, one full bath, one kitchen, dining & living room per ord 43-14. | $50,000 | |
| Sep 12, 2017 | Expired or cancelled withdrawn Mar 2018 | 2400 41st Av | add one dwelling unit (unit c) on 1st flr w/ 2 bdrms, one full bath, one kitchen, dining & living rm per ordinance 162-16.Details
add one dwelling unit (unit c) on 1st flr w/ 2 bdrms, one full bath, one kitchen, dining & living rm per ordinance 162-16. | $50,000 | |
| Nov 15, 2016 | Completed final sign-off Apr 2017 | 2402 41st Av | remove (e) kitchen counter top ,cabinets, flroor tile, in kitchen replace in kind, in (e) position ,remove bathroom tiles, sink & tub ,toilet,replace like kind in same position, with new materials, repalce 3 windows like kind, replace 3 doors in bedroomsDetails
remove (e) kitchen counter top ,cabinets, flroor tile, in kitchen replace in kind, in (e) position ,remove bathroom tiles, sink & tub ,toilet,replace like kind in same position, with new materials, repalce 3 windows like kind, replace 3 doors in bedrooms | $20,000 | |
| Nov 14, 2005 | Completed final sign-off Jan 2006 | 2400 41st Av | Mario Avila Construction | repair termite damage per report #05389Details
repair termite damage per report #05389 | $14,000 |
| Sep 12, 2005 | Completed final sign-off Oct 2005 | 2400 41st Av | Mario Avila Construction | repair dry-rot / header @ garage, stubs @ 1st floor, replace stucco. ref pa# 2005/08/16/0346.Details
repair dry-rot / header @ garage, stubs @ 1st floor, replace stucco. ref pa# 2005/08/16/0346. | $6,500 |
| Aug 16, 2005 | Completed final sign-off Oct 2005 | 2400 41st Av | Mario Avila Construction | remove stucco at deck and front wall of bldng to final out extent of moisture damge-termite report nDetails
remove stucco at deck and front wall of bldng to final out extent of moisture damge-termite report n | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mario Avila Construction (3), Yao Star Construction (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.