Back to kitchen remodel contractors
Marina Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Sep 2019
- Last 24 months
- 0 permits filed
23 permits since 2000: 19 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 4 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2019 | Completed final sign-off Jan 2021 | 518 21st Av | remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor planDetails
remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor plan | $38,000 |
| Feb 26, 2019 | Completed final sign-off Nov 2019 | 1820 Laguna St | revision to pa 201810032111. rev to kitchens, same appliances, replace 2 furnaces, reivse lighting at both flrs, on-demand wh relocated to 2nd flr, relocate bath fixtures at both flrs, structural mods, replace 18 windows (sides & rear only), install insulation at both flrsDetails
revision to pa 201810032111. rev to kitchens, same appliances, replace 2 furnaces, reivse lighting at both flrs, on-demand wh relocated to 2nd flr, relocate bath fixtures at both flrs, structural mods, replace 18 windows (sides & rear only), install insulation at both flrs | $50,000 |
| Nov 5, 2018 | Completed final sign-off Sep 2019 | 520 21st Av | remodel kitchen and two bathrooms. remove a half height wall between the kitchen and dining room for countertop. convert hallway closet to laundry room. install recessed lighting in all rooms replace operable skylight in hallway. no change of (e) floor plans.Details
remodel kitchen and two bathrooms. remove a half height wall between the kitchen and dining room for countertop. convert hallway closet to laundry room. install recessed lighting in all rooms replace operable skylight in hallway. no change of (e) floor plans. | $50,000 |
| Oct 3, 2018 | Completed final sign-off Nov 2019 | 1828 Laguna St | remodel 2 existing flats, no addition of living space, no change to facade. lower fl, remodel bath, kitchen, add full bath, remove fireplace, general repair. upper floor remodel bath, kitchen, add bath, general repairDetails
remodel 2 existing flats, no addition of living space, no change to facade. lower fl, remodel bath, kitchen, add full bath, remove fireplace, general repair. upper floor remodel bath, kitchen, add bath, general repair | $150,000 |
| Nov 3, 2017 | Completed final sign-off Jul 2018 | 1750 Sutter St | remodel kitchen & bathroom change lighitng replace one window & balcony window, door , visible to the street, (like for like)Details
remodel kitchen & bathroom change lighitng replace one window & balcony window, door , visible to the street, (like for like) | $25,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 475 Broadway | remodel extg kitchen at 2nd floor to create a storage space. no exterior work under this permit. including electrical complaint #201654451.Details
remodel extg kitchen at 2nd floor to create a storage space. no exterior work under this permit. including electrical complaint #201654451. | $8,000 |
| Jun 6, 2016 | Completed final sign-off Jan 2017 | 475 Broadway | work on 3rd floor only. remodel laundry, kitchen, convert (e) family room to (n) bedroom, replace (12) windows in-kind on the rear, left and right sides walls (not front side), and repair skylights. windows not visible from street.Details
work on 3rd floor only. remodel laundry, kitchen, convert (e) family room to (n) bedroom, replace (12) windows in-kind on the rear, left and right sides walls (not front side), and repair skylights. windows not visible from street. | $28,000 |
| Aug 6, 2014 | Completed final sign-off Apr 2016 | 2357 31st Av | legalize dwelling unit w/ 2 (e) bedrooms, (e) family room, (e) bathroom & (e) kitchen on 1st floor, per ordinance no 43-14 & dbi info sheet no g-17.Details
legalize dwelling unit w/ 2 (e) bedrooms, (e) family room, (e) bathroom & (e) kitchen on 1st floor, per ordinance no 43-14 & dbi info sheet no g-17. | $37,060 |
| Feb 21, 2012 | Completed final sign-off Nov 2012 | 107 Santa Rosa Av | to comply with his nov# 201172573, dated 1-17-2012. legalize 2 bedrooms, 1 bath and storage, remove kitchen on ground floor. all work on ground floor.Details
to comply with his nov# 201172573, dated 1-17-2012. legalize 2 bedrooms, 1 bath and storage, remove kitchen on ground floor. all work on ground floor. | $15,000 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 209 Quintara St | kitchen and bathroom remodel. no structural. kitchen-at least 50% lighting wattage must be fluorescent. bathroom-fluorescent or controlled by motion sensor.Details
kitchen and bathroom remodel. no structural. kitchen-at least 50% lighting wattage must be fluorescent. bathroom-fluorescent or controlled by motion sensor. | $30,000 |