Back to kitchen remodel contractors
Mar Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Jun 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 1 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2022 | Completed final sign-off May 2024 | 1322 York St | 3rd fl: kitchen & bathroom remodel, new bathroom. demolition as indicated on plans. plumbing, mechanical & electrical as req/indicated. structural work per plans.Details
3rd fl: kitchen & bathroom remodel, new bathroom. demolition as indicated on plans. plumbing, mechanical & electrical as req/indicated. structural work per plans. | $52,000 |
| Oct 2, 2017 | Completed final sign-off Oct 2018 | 164 Moffitt St | remodel kitchen, replace cabinets, countertop, install new appliances. remove non-load bearing wall 12", replace windows & sliding door (not visible from st). new plumbing, install new led lights, new gfci temper proof. new insulation, sheet rock & painting. new hardwood flooringDetails
remodel kitchen, replace cabinets, countertop, install new appliances. remove non-load bearing wall 12", replace windows & sliding door (not visible from st). new plumbing, install new led lights, new gfci temper proof. new insulation, sheet rock & painting. new hardwood flooring | $30,000 |
| Mar 15, 2002 | Completed final sign-off Sep 2002 | 122 02nd Av | 2/fl unit-remodel kitchen-replace cabinets/sink/dishwasher, remove non bearing wall,new elec.outletsDetails
2/fl unit-remodel kitchen-replace cabinets/sink/dishwasher, remove non bearing wall,new elec.outlets | $18,000 |