Map Construction & Design
- Based in
- Petaluma
- On San Francisco permits
- Jul 2008 to May 2014
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 45 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2014 | Completed final sign-off May 2014 | 1308 Larkin St | repair ground existing electrical receptacles, add 4 new vacuum breaker devices and repair dryrot on back lot staircase, install additional type x drywall for 1 hour on garage ceilingDetails
repair ground existing electrical receptacles, add 4 new vacuum breaker devices and repair dryrot on back lot staircase, install additional type x drywall for 1 hour on garage ceiling | $900 |