Mannon Construction
- Based in
- Oakland
- On San Francisco permits
- May 2000 to Jun 2025
- Last 24 months
- 2 permits filed
95 permits since 2000: 84 completed, 2 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2018 | Completed final sign-off Dec 2018 | 3015 Castro St | kitchen remodel - cabinets, new floor, laundry hook up, insulation, dyrwall, paint. bathroom remodel - new shower, vanity, floor, drywall, insulation, paint. fan light fixture at master bedroom, drywall patching, patch crack and paint front stairs, roof patch for vents.Details
kitchen remodel - cabinets, new floor, laundry hook up, insulation, dyrwall, paint. bathroom remodel - new shower, vanity, floor, drywall, insulation, paint. fan light fixture at master bedroom, drywall patching, patch crack and paint front stairs, roof patch for vents. | $20,000 |
| Apr 5, 2017 | Completed final sign-off Jan 2020 | 174 Hearst Av | the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area.Details
the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area. | $250,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2016 | 1280 02nd Av | replace extg unpermitted deck and steps with code conforming landing and stairs. permit extg rear unpermitted rear door.Details
replace extg unpermitted deck and steps with code conforming landing and stairs. permit extg rear unpermitted rear door. | $1,800 |
| Sep 21, 2011 | Completed final sign-off Nov 2011 | 874 Alvarado St | replace 7 windows sashes in kind wood, replace handrail at front stairs 34"-38" above steps, repair dryrot damage to window frame, sill, siding and framing at front non-operable window.Details
replace 7 windows sashes in kind wood, replace handrail at front stairs 34"-38" above steps, repair dryrot damage to window frame, sill, siding and framing at front non-operable window. | $4,200 |
| Nov 4, 2002 | Never finaled issued Nov 2002, no final | 337 Winfield St | ammend 2002/10/02/7968.repair&rebuild front stairs.add headers to windows&door.framing at garage bayDetails
ammend 2002/10/02/7968.repair&rebuild front stairs.add headers to windows&door.framing at garage bay | $4,300 |
| Oct 2, 2002 | Completed final sign-off Mar 2003 | 337 Winfield St | dryrot/termite repair @ front stairway bldg framing. replace front windows & door & garage door. (saDetails
dryrot/termite repair @ front stairway bldg framing. replace front windows & door & garage door. (sa | $17,300 |