Major Innovation Construction Copany
- Based in
- Rohnert Park
- On San Francisco permits
- Apr 2009 to Sep 2012
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 337 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2012 | Completed final sign-off Dec 2012 | 558 Roosevelt Wy | new stair and deck to replace extg. new access to utility area. relocate pg&e.Details
new stair and deck to replace extg. new access to utility area. relocate pg&e. | $15,000 |
| Dec 8, 2011 | Completed final sign-off Dec 2012 | 556 Roosevelt Wy | dryort repair to siding, trim on exterior, windows, stairs, deck. all repairs to be in kind with like materials. windows to be replaced in kind, with aluminum clading on exteiror of a wood windoww. max u factor is 0.40 for window, repair and deck & stair less than 50% in kind repair..Details
dryort repair to siding, trim on exterior, windows, stairs, deck. all repairs to be in kind with like materials. windows to be replaced in kind, with aluminum clading on exteiror of a wood windoww. max u factor is 0.40 for window, repair and deck & stair less than 50% in kind repair.. | $10,000 |