Majestic Scepter* Check Id Or Contr Lic*
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Nov 2018
- Last 24 months
- 0 permits filed
280 permits since 2000: 47 completed, 172 never finaled, 61 expired or cancelled.
Of the 172 never-finaled permits, 6 are 5 to 10 years old, 166 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2015 | Completed final sign-off Jun 2015 | 1480 Shafter Av | comply with nov 201545781. repair front stair in kind per planDetails
comply with nov 201545781. repair front stair in kind per plan | $2,000 |
| Jul 9, 2014 | Completed final sign-off Nov 2014 | 244 Juanita Wy | replace 15sf of stucco at bay window at rear. replace stucco at north, south and west side of house. repair any wooden damage of removed stucco area. at front - remove concrete on entrance stair to slate tiles installation with stucco. repair deck and stair at front right side less than 50%Details
replace 15sf of stucco at bay window at rear. replace stucco at north, south and west side of house. repair any wooden damage of removed stucco area. at front - remove concrete on entrance stair to slate tiles installation with stucco. repair deck and stair at front right side less than 50% | $38,000 |
| May 9, 2003 | Completed final sign-off Jul 2005 | 201 Drake St | remove (e) stair, install carriages with stud, install stucco with tile stairDetails
remove (e) stair, install carriages with stud, install stucco with tile stair | $6,000 |