Madrono Landscape Design Studio Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Aug 2026
- Last 24 months
- 4 permits filed
14 permits since 2000: 10 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 in progress. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 125 Roanoke St | replace existing exterior stair, exist metal spiral removed, new wood stair, replace(e) wood fence in kindDetails
replace existing exterior stair, exist metal spiral removed, new wood stair, replace(e) wood fence in kind | $24,550 |
| Aug 7, 2025 | Completed final sign-off Jan 2026 | 2526 Polk St | exterior rear stairs: repair in kind, less than 50%- remove dilapitaed mud sill and install (e) posts into new simpson abu elevated post bracket with anchors epoxied into (e) concrete foundation. less than 50%.Details
exterior rear stairs: repair in kind, less than 50%- remove dilapitaed mud sill and install (e) posts into new simpson abu elevated post bracket with anchors epoxied into (e) concrete foundation. less than 50%. | $3,500 |