Madden Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jul 2026
- Last 24 months
- 9 permits filed
57 permits since 2000: 46 completed, 4 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 completed, 2 never finaled. Typically 49 days from filing to permit and 16 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2019 | Never finaled issued Apr 2021, no final | 468 Jersey St | remodel kitchen & breakfast room; rework lower room ceiling for new deck above; relocate (new) under 10' spiral stair with 45% setback. not extending building footprint.Details
remodel kitchen & breakfast room; rework lower room ceiling for new deck above; relocate (new) under 10' spiral stair with 45% setback. not extending building footprint. | $150,000 |
| Sep 20, 2017 | Completed final sign-off Oct 2017 | 764 Guerrero St | remove wood decking from landing at unit 762 to trace source of water intrusion, repair and replace inkind. decing and trim 50% repair, not visible from streetDetails
remove wood decking from landing at unit 762 to trace source of water intrusion, repair and replace inkind. decing and trim 50% repair, not visible from street | $3,000 |
| May 8, 2017 | Completed final sign-off May 2017 | 98 Lundys Ln | replace 3-4 joists at upper deck. replace deeck boards. replace joists, in like-kind. work at upper level. total repair not to exceed 50%Details
replace 3-4 joists at upper deck. replace deeck boards. replace joists, in like-kind. work at upper level. total repair not to exceed 50% | $10,500 |
| Jul 5, 2016 | Completed final sign-off Aug 2018 | 428 Jersey St | demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level.Details
demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level. | $120,000 |
| May 19, 2011 | Never finaled issued Jul 2011, no final | 41 Bessie St | demo extg deck in rear yard, add new stair with landing in rear yard, new french doors at garage level, new picture window and door at second floor, replace extg windows same size at 2nd floor,new posts & girder to replace extg posts & girder in kind, new siding to replace extg siding at 2nd flr,Details
demo extg deck in rear yard, add new stair with landing in rear yard, new french doors at garage level, new picture window and door at second floor, replace extg windows same size at 2nd floor,new posts & girder to replace extg posts & girder in kind, new siding to replace extg siding at 2nd flr, | $40,000 |