Back to bathroom remodel contractors
Madden Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jul 2026
- Last 24 months
- 9 permits filed
57 permits since 2000: 46 completed, 4 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 21 completed, 3 in progress, 1 never finaled. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 68 06th Av | remodel 2 bathrooms, same layout, fixtures in same location. replace 3 windows, not visible from street - in kind.Details
remodel 2 bathrooms, same layout, fixtures in same location. replace 3 windows, not visible from street - in kind. | $195,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 2850 Steiner St | remodel 1 bathroom. replace 2 windows & 3 exterior doors, not visible from street.Details
remodel 1 bathroom. replace 2 windows & 3 exterior doors, not visible from street. | $810,000 |
| Aug 5, 2025 | Completed final sign-off Mar 2026 | 2120 Pierce St | remodel existing primary bath and closet in kindDetails
remodel existing primary bath and closet in kind | $50,000 |
| Jul 15, 2025 | Completed final sign-off Jan 2026 | 1247 Stanyan St | remodel (e) bathroom and add dry sauna, replace in kind wet bar on 2nd floor.Details
remodel (e) bathroom and add dry sauna, replace in kind wet bar on 2nd floor. | $50,000 |
| Apr 16, 2025 | Completed final sign-off Oct 2025 | 2795 38th Av | add new primary bathroom & closet at 2nd fl (convert e) sunroom to bath & closet). update all knob & tube. no exterior workDetails
add new primary bathroom & closet at 2nd fl (convert e) sunroom to bath & closet). update all knob & tube. no exterior work | $60,000 |
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 2112 Leavenworth St | remodel kitchen and 2 bathroom (use humidistat controlled fans). replace 4 windows at front and 1 at rear (max u-factor 0.3). no wall removal or layout changes. like-for-like window replacement.Details
remodel kitchen and 2 bathroom (use humidistat controlled fans). replace 4 windows at front and 1 at rear (max u-factor 0.3). no wall removal or layout changes. like-for-like window replacement. | $285,000 |
| Jul 10, 2024 | In progress issued Jul 2024 | 133 07th Av | remodel existing kitchen & bathroom. new stairs to garage and open interior wallsDetails
remodel existing kitchen & bathroom. new stairs to garage and open interior walls | $150,000 |
| May 28, 2024 | Completed final sign-off Oct 2024 | 2825 Laguna St | remodel 1 bathroom and 1 powder room. replace 4 windows in kind not visible from street. replace countertops in kitchen & laundryDetails
remodel 1 bathroom and 1 powder room. replace 4 windows in kind not visible from street. replace countertops in kitchen & laundry | $220,000 |
| Apr 12, 2023 | Completed final sign-off Oct 2023 | 245 Roosevelt Wy | remodel e kitchen, replace existing glass block with 1-hr glass assembly at lightwell. bath remodel in kind.Details
remodel e kitchen, replace existing glass block with 1-hr glass assembly at lightwell. bath remodel in kind. | $60,000 |
| Mar 21, 2023 | Completed final sign-off Aug 2023 | 435 Clipper St | remodel existing bathroom, add 2nd bathroomDetails
remodel existing bathroom, add 2nd bathroom | $80,000 |
| Dec 13, 2022 | Completed final sign-off Dec 2023 | 2114 Leavenworth St | remodel 2 bathrooms (e), plus guest bedroomDetails
remodel 2 bathrooms (e), plus guest bedroom | $70,000 |
| Jul 29, 2022 | Completed final sign-off Mar 2023 | 1436 Cole St | remodel primary bathroom and walk in closet.Details
remodel primary bathroom and walk in closet. | $50,000 |
| Mar 22, 2022 | Completed final sign-off May 2022 | 3338 23rd St | partial bathroom remodel, new tub with shower. new tile work. no alteration of wall, window and door.Details
partial bathroom remodel, new tub with shower. new tile work. no alteration of wall, window and door. | $37,000 |
| Mar 4, 2020 | Never finaled issued Mar 2020, no final | 1 Daniel Burnham Ct | partial bath remodel, replace, tub, toilet, sink faucets, shower/tub tile, repair damaged drywall in hallway (in kind 15 sf max)Details
partial bath remodel, replace, tub, toilet, sink faucets, shower/tub tile, repair damaged drywall in hallway (in kind 15 sf max) | $25,000 |
| Nov 22, 2019 | Completed final sign-off Jul 2020 | 1 Daniel Burnham Ct | #924 9th flr -rebuild/reinstate bath to original layout, replace kitchen cabinets, counters, appliances. replace vanity and sink, reposition light switches to original height, install new engineered flooring and baseboards. new paint. remodel in kind, comply with cec 150 k (3) 150 k .5Details
#924 9th flr -rebuild/reinstate bath to original layout, replace kitchen cabinets, counters, appliances. replace vanity and sink, reposition light switches to original height, install new engineered flooring and baseboards. new paint. remodel in kind, comply with cec 150 k (3) 150 k .5 | $142,281 |
| Sep 16, 2016 | Completed final sign-off Dec 2016 | 448 22nd Av | unit #3: remodel bathroom, remove tub & replace with shower only. new fixtures, toilet, cabinet, sink.Details
unit #3: remodel bathroom, remove tub & replace with shower only. new fixtures, toilet, cabinet, sink. | $28,000 |
| Jul 5, 2016 | Completed final sign-off Aug 2018 | 428 Jersey St | demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level.Details
demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level. | $120,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 183 Jordan Av | remodel bathroom - replace plumbing fixtures, 1 shower + pan, 1 vanity, 1 toilet same locations, replace lighting - led recessed, 1 wall sconce, same locations - replace exhaust pan, same location. size = 6'x 6'Details
remodel bathroom - replace plumbing fixtures, 1 shower + pan, 1 vanity, 1 toilet same locations, replace lighting - led recessed, 1 wall sconce, same locations - replace exhaust pan, same location. size = 6'x 6' | $14,500 |
| Sep 17, 2012 | Completed final sign-off Dec 2012 | 70 Sea View Tr | replace plumbing & electrical fixtures in same location. replace tile, replace vanity, replace shower surround. one bathroom remodel.Details
replace plumbing & electrical fixtures in same location. replace tile, replace vanity, replace shower surround. one bathroom remodel. | $25,000 |
| Jun 29, 2012 | Completed final sign-off Aug 2012 | 65 Ramona Av | remodel bathroom: add toilet, add shower, move sink, remove 2 closet walls to enlarge bathroom & allow access from bedroom, install new tub in same location.Details
remodel bathroom: add toilet, add shower, move sink, remove 2 closet walls to enlarge bathroom & allow access from bedroom, install new tub in same location. | $25,000 |
| Nov 30, 2011 | Completed final sign-off Mar 2012 | 3338 23rd St | 2nd floor interior remodel. upgrade extg bathroom, kitchen and walk-in closet. replace 3 swing doors with pocket doors.Details
2nd floor interior remodel. upgrade extg bathroom, kitchen and walk-in closet. replace 3 swing doors with pocket doors. | $70,000 |
| Jun 10, 2010 | Completed final sign-off Nov 2010 | 671 Teresita Bl | new bathroom at first floor & new gas fireplace at new lounge.Details
new bathroom at first floor & new gas fireplace at new lounge. | $25,000 |
| Oct 9, 2009 | Completed final sign-off Dec 2009 | 2722 40th Av | first floor. addition of full bathroom and relocation of furnace and w/h.Details
first floor. addition of full bathroom and relocation of furnace and w/h. | $10,000 |
| Sep 16, 2009 | Completed final sign-off Jan 2010 | 187 Jordan Av | basement remodel. relocation of non-conforming stairs per code, remodel bathroom, media room & lounge area. (n) windows and doors, includes electrical and plumbing work, legalize bathroom @ basement.Details
basement remodel. relocation of non-conforming stairs per code, remodel bathroom, media room & lounge area. (n) windows and doors, includes electrical and plumbing work, legalize bathroom @ basement. | $50,000 |
| Jun 29, 2009 | Completed final sign-off Oct 2009 | 187 Jordan Av | bathroom remodel on middle floor. remove bathtub & relcoate walk-in shower. new vanity and washer & dryer zone.Details
bathroom remodel on middle floor. remove bathtub & relcoate walk-in shower. new vanity and washer & dryer zone. | $15,000 |