Macro Builder Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Aug 2026
- Last 24 months
- 2 permits filed
120 permits since 2000: 93 completed, 5 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 7 completed, 2 never finaled, 2 expired or cancelled. Typically 6 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2022 | Completed final sign-off Dec 2023 | 2467 17th Av | repair damaged exterior stair, scope is to be less than 50% of front stairs.Details
repair damaged exterior stair, scope is to be less than 50% of front stairs. | $500 |
| Dec 14, 2020 | Expired or cancelled withdrawn Nov 2022 | 2467 17th Av | remove severly damaged exterior stairway at front. replace with concrete stairway & rail wall above slab with same measurement at the same location per plan. stairway partition wall under slab of concrete stairway is to remain unchanged.Details
remove severly damaged exterior stairway at front. replace with concrete stairway & rail wall above slab with same measurement at the same location per plan. stairway partition wall under slab of concrete stairway is to remain unchanged. | $10,000 |
| Oct 18, 2018 | Completed final sign-off Sep 2019 | 2424 19th Av | construct 2 bedroom , 2 full bathrooms & family room @ ground fl; remocate (e) kitchen, bathrm, add 1 new bath room & convert 9e) kitchen, dining space to bedrooms @ 2nd floor; re-built (e) interior staircase from 2nd fl. down to ground flDetails
construct 2 bedroom , 2 full bathrooms & family room @ ground fl; remocate (e) kitchen, bathrm, add 1 new bath room & convert 9e) kitchen, dining space to bedrooms @ 2nd floor; re-built (e) interior staircase from 2nd fl. down to ground fl | $82,000 |
| Feb 6, 2018 | Completed final sign-off Jan 2019 | 1271 35th Av | 1) construct 2 bedrooms, 2 bath rm, & family rm at ground floor(including in fill under extg bedroom).2)relocate kitchen, remodel extg bathroom. add 1 new bathrm, rebuilt interior stair, & construct 2 skylight at 2nd fl. 3) construct nw deck at rear of bldg(size approx 10'x3'6")Details
1) construct 2 bedrooms, 2 bath rm, & family rm at ground floor(including in fill under extg bedroom).2)relocate kitchen, remodel extg bathroom. add 1 new bathrm, rebuilt interior stair, & construct 2 skylight at 2nd fl. 3) construct nw deck at rear of bldg(size approx 10'x3'6") | $80,000 |
| Mar 29, 2016 | Completed final sign-off Aug 2021 | 2 Modoc Av | to comply with nov 201586091, legalize (e) unit on ground floor per ordinance 43-14. new rear stairs. fire sprinkler ground floor under separte permits.Details
to comply with nov 201586091, legalize (e) unit on ground floor per ordinance 43-14. new rear stairs. fire sprinkler ground floor under separte permits. | $40,000 |
| Jul 12, 2013 | Completed final sign-off Jun 2014 | 1879 23rd Av | 1)add one bedroom, one full bath and family room at ground floor. 2)remodel bathroom, add on full bath and study at 2nd floor. 3)add new deck and stairway at rear.Details
1)add one bedroom, one full bath and family room at ground floor. 2)remodel bathroom, add on full bath and study at 2nd floor. 3)add new deck and stairway at rear. | $45,000 |
| Nov 10, 2010 | Never finaled issued Nov 2010, no final | 2346 40th Av | interior remodel: ground floor - add family room, relocate bathroom, furnace & water heater, enlarge stair, new patio door. second floor - remodel two bathrooms & kitchen, remove bearing wall at kitchen.Details
interior remodel: ground floor - add family room, relocate bathroom, furnace & water heater, enlarge stair, new patio door. second floor - remodel two bathrooms & kitchen, remove bearing wall at kitchen. | $30,000 |
| Jul 1, 2010 | Expired or cancelled cancelled Jan 2026 | 574 38th Av | upgrade (e) study room at lower floor. (e) mezzanine convert to bedroom. add half bathroom & construct (n) staircase from lower floor to mezzanine. (re-frame mezzanine floor)Details
upgrade (e) study room at lower floor. (e) mezzanine convert to bedroom. add half bathroom & construct (n) staircase from lower floor to mezzanine. (re-frame mezzanine floor) | $28,000 |
| Jun 29, 2009 | Never finaled issued Jun 2009, no final | 2068 Mcallister St | replace hand rail for the rear stairway at the front bldg. provide peep hole for entry doors for the units at rear bldgDetails
replace hand rail for the rear stairway at the front bldg. provide peep hole for entry doors for the units at rear bldg | $600 |
| Mar 24, 2008 | Completed final sign-off Aug 2008 | 3635 Kirkham St | construct one bedroom, family room w/ laundry area, 1 bath room at ground floor. construct a deck at rear of builiding ( size approx. 10' x 7' w/landing and stair), change one rear window to sliding door.Details
construct one bedroom, family room w/ laundry area, 1 bath room at ground floor. construct a deck at rear of builiding ( size approx. 10' x 7' w/landing and stair), change one rear window to sliding door. | $32,000 |
| Jan 5, 2005 | Completed final sign-off Apr 2005 | 548 06th Av | repair wood stairs, delay at (3) structural support. less than 50% replacement per termite report.Details
repair wood stairs, delay at (3) structural support. less than 50% replacement per termite report. | $2,000 |