Back to bathroom remodel contractors
Macgyver Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Aug 2024
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 15 completed. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2018 | Completed final sign-off Sep 2019 | 400 Beale St | merging of two units into one single unit, demising wall between(e) units to be removed, one kitchen to be removed, kitchen, bathroom and living space to be removed, lighting to be updated, plumbing to be re-routed by nessary, fire sprinkler heads to be relocated as required (e) wall is removedDetails
merging of two units into one single unit, demising wall between(e) units to be removed, one kitchen to be removed, kitchen, bathroom and living space to be removed, lighting to be updated, plumbing to be re-routed by nessary, fire sprinkler heads to be relocated as required (e) wall is removed | $99,160 |
| Mar 7, 2018 | Completed final sign-off Sep 2019 | 400 Beale St | merging of two units into one single unit, demising wall between(e) units to be removed, one kitchen to be removed, kitchen, bathroom and living space to be removed, lighting to be updated, plumbing to be re-routed by nessary, fire sprinkler heads to be relocated as required (e) wall is removedDetails
merging of two units into one single unit, demising wall between(e) units to be removed, one kitchen to be removed, kitchen, bathroom and living space to be removed, lighting to be updated, plumbing to be re-routed by nessary, fire sprinkler heads to be relocated as required (e) wall is removed | $99,160 |
| Feb 7, 2018 | Completed final sign-off Oct 2018 | 2555 Filbert St | remodel (e) master bath and (e) guest bath. provide new cabinets and new island for (e) kitchen, replace 1 fireplace with gas. remove elevator and infill space for master bathDetails
remodel (e) master bath and (e) guest bath. provide new cabinets and new island for (e) kitchen, replace 1 fireplace with gas. remove elevator and infill space for master bath | $40,000 |
| Jan 17, 2018 | Completed final sign-off Sep 2018 | 2836 22nd St | 2nd floor - remodel kitchen with all new cabinets, fixtures, finishes. add 1 full bath, cover center patio with skylight; add new wood deck at rear yard with spiral stairDetails
2nd floor - remodel kitchen with all new cabinets, fixtures, finishes. add 1 full bath, cover center patio with skylight; add new wood deck at rear yard with spiral stair | $55,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2018 | 1900 Broadway | revision to app#201710312800. moving 2 walls and add a bathroom to permit.Details
revision to app#201710312800. moving 2 walls and add a bathroom to permit. | |
| Oct 31, 2017 | Completed final sign-off Apr 2018 | 1900 Broadway | unit #3: second floor, remodel kitchen, 2 bathrooms, lighting, finishes. no walls moved, removed, added or infilled. all existing layout to remain unchanged. all wor within unit no wk in common areas, no fire alarm or fire sprinkler work required.Details
unit #3: second floor, remodel kitchen, 2 bathrooms, lighting, finishes. no walls moved, removed, added or infilled. all existing layout to remain unchanged. all wor within unit no wk in common areas, no fire alarm or fire sprinkler work required. | $200,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 341 Mississippi St | 2/f bathroom remodel, changeout window & door in back of house in-kind, no structural load baering walls to be altered.Details
2/f bathroom remodel, changeout window & door in back of house in-kind, no structural load baering walls to be altered. | $50,000 |
| Nov 14, 2016 | Completed final sign-off Feb 2017 | 2620 Sutter St | #a: existing bathroom to be remodeled. installation of a custom built closet in master bedroom, alter kitchen cabinets, no structural bering wall alteration.Details
#a: existing bathroom to be remodeled. installation of a custom built closet in master bedroom, alter kitchen cabinets, no structural bering wall alteration. | $80,000 |
| Apr 18, 2016 | Completed final sign-off Sep 2016 | 3009 Sacramento St | unit #1 lower floor - kitchen remodel - flooring, cabinets. bathroom work - retile floor/wall, new vanity. no structural, bearing wall alterations.Details
unit #1 lower floor - kitchen remodel - flooring, cabinets. bathroom work - retile floor/wall, new vanity. no structural, bearing wall alterations. | $30,000 |
| Apr 11, 2016 | Completed final sign-off Sep 2016 | 3009 Sacramento St | top floor unit # 3, kitchen remodel, flooring & cabinets, no structural alterations, bathroom work, retile floor & wallsDetails
top floor unit # 3, kitchen remodel, flooring & cabinets, no structural alterations, bathroom work, retile floor & walls | $16,000 |
| Nov 20, 2014 | Completed final sign-off Mar 2015 | 210 17th Av | kitchen- expand kitchen island with cabinet, countertop. bathroom/closet- re-tile, new vanity, new counter top with fixtures. no structural alteration.Details
kitchen- expand kitchen island with cabinet, countertop. bathroom/closet- re-tile, new vanity, new counter top with fixtures. no structural alteration. | $28,000 |
| Mar 31, 2014 | Completed final sign-off Mar 2015 | 4365 26th St | renovation of mstr bath, new tile, cntrtops,fixtures,lighting vent to remain. expand closet, expand rm by removing e wall and door, replace with flush beam. relocate e door to new mstr bdrm per plan.new pocket door. bdrm 2 additional closet space by removing e door and wallsDetails
renovation of mstr bath, new tile, cntrtops,fixtures,lighting vent to remain. expand closet, expand rm by removing e wall and door, replace with flush beam. relocate e door to new mstr bdrm per plan.new pocket door. bdrm 2 additional closet space by removing e door and walls | $65,000 |
| Nov 28, 2012 | Completed final sign-off Jan 2013 | 301 Mission St | revision to appl # 201206122426, existing bathroom no structural changes for one bathroom, bathroom remodel includes new tiles slab tub shower enclosure.Details
revision to appl # 201206122426, existing bathroom no structural changes for one bathroom, bathroom remodel includes new tiles slab tub shower enclosure. | $8,000 |
| Mar 29, 2011 | Completed final sign-off Jun 2011 | 620 Ortega St | ground floor alteration, relocate existing wall, relocate door and add 2 new doors for art studio, gallery space and half bath at ground floor; legalize space, lighting/elec under separate permitDetails
ground floor alteration, relocate existing wall, relocate door and add 2 new doors for art studio, gallery space and half bath at ground floor; legalize space, lighting/elec under separate permit | $8,500 |
| Sep 16, 2010 | Completed final sign-off Jan 2011 | 550 Mississippi St | kitchen and bathroom remodel. add one skylight in bathroom at rear, add two windows to south elevations at rear, reconfigure (e) west windows and door at rearDetails
kitchen and bathroom remodel. add one skylight in bathroom at rear, add two windows to south elevations at rear, reconfigure (e) west windows and door at rear | $24,000 |