Back to kitchen remodel contractors
M K Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2006 to Dec 2006
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2006 | Completed final sign-off Apr 2007 | 220 Laussat St | replace shower w/tub,remove non structural interior wall in kitchen,replace water heater with ex mounted tankless unit,replace pedestal sink with cabinet, rip in vanity sink, revise elec to comply with nov 200001831 work in 220 laussat onlyDetails
replace shower w/tub,remove non structural interior wall in kitchen,replace water heater with ex mounted tankless unit,replace pedestal sink with cabinet, rip in vanity sink, revise elec to comply with nov 200001831 work in 220 laussat only | $15,000 |