M D Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Sep 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 0 days from filing to permit and 37 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2015 | Completed final sign-off Apr 2016 | 3131 Divisadero St | revision to pa 2014 1028 0068: replace 3 windows and add 2 total of 5 windows - none visible from stret. add closet over stair.Details
revision to pa 2014 1028 0068: replace 3 windows and add 2 total of 5 windows - none visible from stret. add closet over stair. | $12,000 |
| Oct 28, 2014 | Completed final sign-off Apr 2016 | 3131 Divisadero St | alt. and remodel to lower unit of apt. 3131b - new open stair at rear to be shared with all tenants. scope includes interior remodel with new interior stair to connect to basement habitable space repave patio at rear mech, elect & plumbing are design build under separate permit.Details
alt. and remodel to lower unit of apt. 3131b - new open stair at rear to be shared with all tenants. scope includes interior remodel with new interior stair to connect to basement habitable space repave patio at rear mech, elect & plumbing are design build under separate permit. | $100,000 |
| Oct 1, 2012 | Completed final sign-off Nov 2012 | 1424 Ingalls St | repair damage to front stair and front garage wall due to vehicle crashed, less than 20%Details
repair damage to front stair and front garage wall due to vehicle crashed, less than 20% | $3,500 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1375 Palou Av | repair & replace in kind rear building stairs - upgrade handrails and guardrails to be sfbc and compliant. install new stringer at center of stair tread/riser. run. up to 50% repair.Details
repair & replace in kind rear building stairs - upgrade handrails and guardrails to be sfbc and compliant. install new stringer at center of stair tread/riser. run. up to 50% repair. | $10,000 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 1610 Golden Gate Av | unit #2 - huseby & assoc. -repair fire scape staircase in lightwell approx. 10%, 2 posts, 5 steps and 1 small landing. repair in kind.Details
unit #2 - huseby & assoc. -repair fire scape staircase in lightwell approx. 10%, 2 posts, 5 steps and 1 small landing. repair in kind. | $1,500 |
| Mar 18, 2011 | Completed final sign-off Nov 2012 | 305 Bennington St | exterior work at front of home: remove exterior facade & replace with hardiplank siding. relocate (e) lower unit entrance & (n) lower unit patio. exterior work at back of home: repair stairs & siding, widen garage. seismic upgrade & foundation 1st floorDetails
exterior work at front of home: remove exterior facade & replace with hardiplank siding. relocate (e) lower unit entrance & (n) lower unit patio. exterior work at back of home: repair stairs & siding, widen garage. seismic upgrade & foundation 1st floor | $75,000 |
| Jan 14, 2011 | Completed final sign-off Jan 2011 | 541 Hill St | repair dry rot damaged stair components @ rear of bldg. less than 50% repair in kind of stair. no change to walls, windows or doors.Details
repair dry rot damaged stair components @ rear of bldg. less than 50% repair in kind of stair. no change to walls, windows or doors. | $2,500 |