M B Development

Contractor license
778837
State license record
Based in
Castro Valley
On San Francisco permits
Jun 2001 to Dec 2025
Last 24 months
1 permit filed

10 permits since 2000: 6 completed, 2 never finaled, 2 expired or cancelled.

Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllRoof deck 2Stairs 3Kitchen remodel 3Bathroom remodel 3

3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 121 days from filing to permit and 1581 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 6, 2020Never finaled
issued Dec 2020, no final
126 Henry Stadd unit per ordinance# 162-16. 1 bedroom & 1 bath.
Details
Permit
202001061260
Status
issued
Filed
Jan 6, 2020
Permit issued
Dec 2, 2020
Declared cost
$145,000
Address
126 Henry St

add unit per ordinance# 162-16. 1 bedroom & 1 bath.

Open the permit page

$145,000
Feb 27, 2018Completed
final sign-off Oct 2022
4118 21st Stbasement: excavate space to gain more ceiling height, infill under (e) floor above, reconfigure stair connection to 1st flr, new door opening to yard, new living room, bathroom, wetbar. 1st flr - reconfigure (e) spaces, add 2 new bedrms, 2 baths, laundry no facade work, no work visible from st
Details
Permit
201802272279
Status
complete
Filed
Feb 27, 2018
Permit issued
Jun 28, 2018
Final sign-off
Oct 26, 2022
Declared cost
$220,000
Address
4118 21st St

basement: excavate space to gain more ceiling height, infill under (e) floor above, reconfigure stair connection to 1st flr, new door opening to yard, new living room, bathroom, wetbar. 1st flr - reconfigure (e) spaces, add 2 new bedrms, 2 baths, laundry no facade work, no work visible from st

Open the permit page

$220,000
Jul 6, 2016Never finaled
issued Aug 2016, no final
83 Seward Stwork to top floor unit: remove partitions, reconfigure kitchen and bathroom, new washer dryer, expand closet at master, replacement windows and doors in kind.
Details
Permit
201607061646
Status
issued
Filed
Jul 6, 2016
Permit issued
Aug 9, 2016
Declared cost
$115,000
Address
83 Seward St

work to top floor unit: remove partitions, reconfigure kitchen and bathroom, new washer dryer, expand closet at master, replacement windows and doors in kind.

Open the permit page

$115,000