Back to kitchen remodel contractors
Lyman Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Oct 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2008 | Completed final sign-off Aug 2008 | 901 Silver Av | remove & replace kitchen upper and lower cabinets and counter top. refinish hardwood floor in living room and hall. no structural work. (comply with complaint # 200860791).Details
remove & replace kitchen upper and lower cabinets and counter top. refinish hardwood floor in living room and hall. no structural work. (comply with complaint # 200860791). | $1,500 |
| Jun 10, 2008 | Expired or cancelled expired Mar 2010 | 1450 California St | unit 3 - remodel kitchen-replace cabinets & countertop. remodel bathroom-replace toilet &bathtub. replace 4 windows, same size u-factor max 0.67. not visible from street. work in unit 3 only.Details
unit 3 - remodel kitchen-replace cabinets & countertop. remodel bathroom-replace toilet &bathtub. replace 4 windows, same size u-factor max 0.67. not visible from street. work in unit 3 only. | $16,625 |
| Jan 23, 2008 | Completed final sign-off Mar 2008 | 19 Porter St | remodel 1 existing kitchen and bath. minor deck repair under 50 %Details
remodel 1 existing kitchen and bath. minor deck repair under 50 % | $40,000 |