Lusardi Construction Co
- Based in
- San Marcos
- On San Francisco permits
- Apr 2011 to Nov 2024
- Last 24 months
- 1 permit filed
39 permits since 2000: 32 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 2 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2023 | Completed final sign-off Jul 2023 | 135 Mississippi St | revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lotDetails
revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lot | $12,500 |