Lung Fung Const & Elec Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2026
- Last 24 months
- 1 permit filed
69 permits since 2000: 63 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 26 days from filing to permit and 540 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2022 | Completed final sign-off Aug 2023 | 33 Bella Vista Wy | 2/f: demolish (e) interior stair and replace with new interior stair. remodel (e) bathroom and kitchen at 1/f. remodel (e) bedroom, new media room, laundry and bathrooms. new 1 level deck at rear yard.Details
2/f: demolish (e) interior stair and replace with new interior stair. remodel (e) bathroom and kitchen at 1/f. remodel (e) bedroom, new media room, laundry and bathrooms. new 1 level deck at rear yard. | $95,000 |
| Dec 12, 2017 | Completed final sign-off Feb 2021 | 40 Kittredge Tr | horizontal addition of a study room to the 3rd fl & a deck on the same level.Details
horizontal addition of a study room to the 3rd fl & a deck on the same level. | $40,000 |
| Sep 24, 2014 | Completed final sign-off Aug 2016 | 124 Clarendon Av | evision to 201408274890: new deck off 1st floor living roomDetails
evision to 201408274890: new deck off 1st floor living room | $7,000 |
| Nov 26, 2008 | Completed final sign-off Dec 2009 | 2364 Fulton St | revision to pa# 2007-0228-5132-revision to remove new kitchen in the 2364 (upper unit), remove interior staircase between the 2366 (lower unit) & the new basement suite. expand the new ground floor deck to the western property line & to the northern 75% buildable area line in the rear yardDetails
revision to pa# 2007-0228-5132-revision to remove new kitchen in the 2364 (upper unit), remove interior staircase between the 2366 (lower unit) & the new basement suite. expand the new ground floor deck to the western property line & to the northern 75% buildable area line in the rear yard | $240,000 |
| Oct 10, 2007 | Completed final sign-off Aug 2010 | 41 Mirabel Av | remodel extg 3 story 2 unit residence with illegal unit. combine upper 2 storages into one and legalize lower floor into second unit. addition of 6'3 at rear and new rear deck with stairDetails
remodel extg 3 story 2 unit residence with illegal unit. combine upper 2 storages into one and legalize lower floor into second unit. addition of 6'3 at rear and new rear deck with stair | $450,000 |