Back to bathroom remodel contractors
Lung Fung Const & Elec Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2026
- Last 24 months
- 1 permit filed
69 permits since 2000: 63 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 2 expired or cancelled. Typically 8 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 1580 Jackson St | apt #15: remodel kitchen and bathroom. no removal of wallsDetails
apt #15: remodel kitchen and bathroom. no removal of walls | $20,000 |
| Jan 17, 2023 | Completed final sign-off Aug 2023 | 33 Bella Vista Wy | revision to 202201196263. replace (e) skylights, replace (e) lightwell windows and door, reconfigure 2nd floor bathroom layout, and new closets, new louver opening @ laundry, and new gas fireplace.Details
revision to 202201196263. replace (e) skylights, replace (e) lightwell windows and door, reconfigure 2nd floor bathroom layout, and new closets, new louver opening @ laundry, and new gas fireplace. | $8,035 |
| Jan 19, 2022 | Completed final sign-off Aug 2023 | 33 Bella Vista Wy | 2/f: demolish (e) interior stair and replace with new interior stair. remodel (e) bathroom and kitchen at 1/f. remodel (e) bedroom, new media room, laundry and bathrooms. new 1 level deck at rear yard.Details
2/f: demolish (e) interior stair and replace with new interior stair. remodel (e) bathroom and kitchen at 1/f. remodel (e) bedroom, new media room, laundry and bathrooms. new 1 level deck at rear yard. | $95,000 |
| Nov 2, 2021 | Completed final sign-off Feb 2023 | 294 Chester Av | at 1st fl constuct (n) family room, study, study, home office and laundry room. @2 2nd floor remodel and relocate(e) kitchen and bathroom. (n) bathroom and skylights. remodel and replace(e) interior stair in kind.Details
at 1st fl constuct (n) family room, study, study, home office and laundry room. @2 2nd floor remodel and relocate(e) kitchen and bathroom. (n) bathroom and skylights. remodel and replace(e) interior stair in kind. | $90,000 |
| Aug 13, 2021 | Completed final sign-off Oct 2021 | 482 Gellert Dr | bathroom make-over (1) enlage shower stall and new shower rpan. relcoate light-led. replace floor and wall tile. add exhaust fan.Details
bathroom make-over (1) enlage shower stall and new shower rpan. relcoate light-led. replace floor and wall tile. add exhaust fan. | $3,500 |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 760 24th Av | interior renovations, on 2 floors including relocation of power room & kitchen, and addition of bathroom on upper floor. rear windows some to be changed - all wood-clad.Details
interior renovations, on 2 floors including relocation of power room & kitchen, and addition of bathroom on upper floor. rear windows some to be changed - all wood-clad. | $50,000 |
| Jun 14, 2017 | Completed final sign-off Mar 2018 | 8 Marion Pl | convert storage room to a closet. kitchen remodel. bathroom remodel w/window replacement. all in kindDetails
convert storage room to a closet. kitchen remodel. bathroom remodel w/window replacement. all in kind | $45,000 |
| Oct 13, 2016 | Completed final sign-off Oct 2018 | 4164 26th St | legalize as-build unit (unit c) included kitchen, (2) bedrooms, (2) bath, living room, mud room on basementDetails
legalize as-build unit (unit c) included kitchen, (2) bedrooms, (2) bath, living room, mud room on basement | $50,000 |
| Sep 30, 2014 | Completed final sign-off Sep 2015 | 15 San Anselmo Av | remodel 2 upstairs bathrooms. replace 65 feet of concrete foundation. upgrade lighting throughout house. move stacked laundry to upper bedrm 3 closet. compliance with maher ordinance no 155-13 not required.Details
remodel 2 upstairs bathrooms. replace 65 feet of concrete foundation. upgrade lighting throughout house. move stacked laundry to upper bedrm 3 closet. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Aug 27, 2014 | Completed final sign-off Nov 2015 | 124 Clarendon Av | interior renovations including kitchens and baths. new windows at rear of house with lateral upgrades. voluntary structural upgradesDetails
interior renovations including kitchens and baths. new windows at rear of house with lateral upgrades. voluntary structural upgrades | $100,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 3303 Folsom St | replace dry rot at light well off lower level bathroom (3'x10')Details
replace dry rot at light well off lower level bathroom (3'x10') | $3,000 |
| Mar 13, 2012 | Completed final sign-off Apr 2014 | 772 Wisconsin St | revision to pa #200707136790 - remdoel including installnew velux mtl framed skylight with built up curb, & 60 min mlt-framed fire rated skylite for class "a" roof. expanding basement & adding (n) guardrail,(n) planters, (n) stairs, (n) stucco & (n) sliding door. interior remdoel of kitchen & baths.Details
revision to pa #200707136790 - remdoel including installnew velux mtl framed skylight with built up curb, & 60 min mlt-framed fire rated skylite for class "a" roof. expanding basement & adding (n) guardrail,(n) planters, (n) stairs, (n) stucco & (n) sliding door. interior remdoel of kitchen & baths. | $50,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 157 Bradford St | revision to 200912183502 to include revised bath layout at 2nd fl into 2 separate baths, relocate fireplace, remove pocket door between master and studyDetails
revision to 200912183502 to include revised bath layout at 2nd fl into 2 separate baths, relocate fireplace, remove pocket door between master and study | $9,000 |
| Mar 23, 2011 | Expired or cancelled expired Aug 2012 | 293 Union St | remodel kitchen & bath, add 1 full bath, replace furnace & water heater.Details
remodel kitchen & bath, add 1 full bath, replace furnace & water heater. | $20,000 |
| Dec 18, 2009 | Completed final sign-off Oct 2011 | 157 Bradford St | remodel rear addition. provide new foundation & addition. provide full structural upgrade. construct new addition. interior remodel per plans. new plumbing & electrical throught. add new bedroom, study, bath @ 1st floor.Details
remodel rear addition. provide new foundation & addition. provide full structural upgrade. construct new addition. interior remodel per plans. new plumbing & electrical throught. add new bedroom, study, bath @ 1st floor. | $100,000 |
| Jan 28, 2005 | Expired or cancelled expired Jan 2007 | 2447 Vallejo St | unit 4 - remodel kitchen & bathroom replace all kitchen cabinets & appliance. no structural work....Details
unit 4 - remodel kitchen & bathroom replace all kitchen cabinets & appliance. no structural work.... | $30,000 |
| Apr 14, 2004 | Completed final sign-off Aug 2004 | 154 Scotia Av | add two bedrom one full bath rm. one storage/laundry on (e)g/f and also construction one **Details
add two bedrom one full bath rm. one storage/laundry on (e)g/f and also construction one ** | $18,000 |