Back to kitchen remodel contractors
Loveland And Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Oct 2014
- Last 24 months
- 0 permits filed
26 permits since 2000: 16 completed, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 never finaled. Typically 4 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2013 | Never finaled issued Aug 2013, no final | 300 03rd St | remove top 3rd of non load gearing partition in east kitchen wall. replace tile toilet and bath tub in master bathroom. install nu-heat mat in master bath floor. provide sound alteration in master bath floor. no structural columns altered.Details
remove top 3rd of non load gearing partition in east kitchen wall. replace tile toilet and bath tub in master bathroom. install nu-heat mat in master bath floor. provide sound alteration in master bath floor. no structural columns altered. | $38,000 |
| Jul 5, 2012 | Never finaled issued Jul 2012, no final | 190 Taraval St | renovate extg kitchen at 2nd level. remove extg rear deck.Details
renovate extg kitchen at 2nd level. remove extg rear deck. | $35,000 |
| Sep 27, 2010 | Completed final sign-off Nov 2011 | 1838 15th Av | construct new bath and laundry at 1st fl. remodel (e) kitchen, bath, and living rm at 2nd fl, reconstruct (e) interior stairs, replacement and new windows at 1st and 2nd floors ( at front and rear)Details
construct new bath and laundry at 1st fl. remodel (e) kitchen, bath, and living rm at 2nd fl, reconstruct (e) interior stairs, replacement and new windows at 1st and 2nd floors ( at front and rear) | $140,000 |
| Jul 20, 2010 | Completed final sign-off Apr 2011 | 70 Santa Rita Av | renovate existing kitchen, replace toilet in existing powder room in-kind, construct new bath on second floor. replace greenhouse window with new wood window; add new wood window at new second floor bathroom.Details
renovate existing kitchen, replace toilet in existing powder room in-kind, construct new bath on second floor. replace greenhouse window with new wood window; add new wood window at new second floor bathroom. | $45,000 |