Louis Devereux Landscapes
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Mar 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 336 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2018 | Completed final sign-off Apr 2021 | 1088 Sansome St | (n) exterior improvements on penthouse level (roof). add (n) flooring deck and railingsDetails
(n) exterior improvements on penthouse level (roof). add (n) flooring deck and railings | $50,000 |
| Aug 6, 2018 | Completed final sign-off Dec 2018 | 29 Lansdale Av | replace existing rear deck with new rear deck. new contrete wall at rear at bottom existing slopeDetails
replace existing rear deck with new rear deck. new contrete wall at rear at bottom existing slope | $35,000 |