Back to kitchen remodel contractors
London Chimney Services Inc
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2000 to Mar 2026
- Last 24 months
- 1 permit filed
55 permits since 2000: 48 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2016 | Completed final sign-off Oct 2016 | 4443 20th St | kitchen range fan vent system. run liner only thru brick chimney. 6" diameter ul listed materialDetails
kitchen range fan vent system. run liner only thru brick chimney. 6" diameter ul listed material | $1,620 |
| Aug 28, 2012 | Completed final sign-off Oct 2012 | 904 Steiner St | remove entire back chimney top to footing that passes through kitchen. remove living room chimney down to smoke chamber. log firebrick inside burning area of firebox. run class a vent pipe from top of smoke chamber thru roof to proper compliant ht. ceramic gas logs inside fire box. 1st/2nd flDetails
remove entire back chimney top to footing that passes through kitchen. remove living room chimney down to smoke chamber. log firebrick inside burning area of firebox. run class a vent pipe from top of smoke chamber thru roof to proper compliant ht. ceramic gas logs inside fire box. 1st/2nd fl | $14,200 |