Linebarger Const & Plbg
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Oct 2025
- Last 24 months
- 3 permits filed
81 permits since 2000: 69 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2016 | Completed final sign-off Mar 2017 | 29 Ramona Av | replace dry rotted framing & stairs in center court yard, new framing & decking to be pressure treated materials. railing to be redoowd. (2 flights & < 50% repair)Details
replace dry rotted framing & stairs in center court yard, new framing & decking to be pressure treated materials. railing to be redoowd. (2 flights & < 50% repair) | $15,000 |
| Feb 20, 2013 | Completed final sign-off Sep 2013 | 155 Anzavista Av | replace existing 2x6 joist framing with 2x6 pressure treated materials. deck is at rear of house approx 13'-6x8'-2. new decking & reailing system 42" high, spacing to be less than 4" at pickets and bottom rail. existing post & beam to remain. deck joist/decking/railing to be replaced.Details
replace existing 2x6 joist framing with 2x6 pressure treated materials. deck is at rear of house approx 13'-6x8'-2. new decking & reailing system 42" high, spacing to be less than 4" at pickets and bottom rail. existing post & beam to remain. deck joist/decking/railing to be replaced. | $9,000 |
| Mar 19, 2004 | Completed final sign-off May 2004 | 155 Anzavista Av | replace rotted post + beam supporting deck. will replace w/same size materials-new lumber to be presDetails
replace rotted post + beam supporting deck. will replace w/same size materials-new lumber to be pres | $1,800 |
| Jun 1, 2000 | Expired or cancelled cancelled Aug 2001 | 1680 11th Av | install new deck off rear of house install stairs to rear garden 6 ft horz deck/strs off main floorDetails
install new deck off rear of house install stairs to rear garden 6 ft horz deck/strs off main floor | $18,000 |