Back to bathroom remodel contractors
Linebarger Const & Plbg
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Oct 2025
- Last 24 months
- 3 permits filed
81 permits since 2000: 69 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 15 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2023 | Completed final sign-off Dec 2023 | 2643 17th Av | kitchen remodel, new cabinets, add (1)skylight, replace (e)skylight, enlarge opening kitchen-dining rm, relocate opening from kitchen-hallwy; bathroom remodel, relocate fixtures, entry door to hallwy, install (2)new lightwell windows in (e)location, remove/fill (2)windows-hall closet & dining rmDetails
kitchen remodel, new cabinets, add (1)skylight, replace (e)skylight, enlarge opening kitchen-dining rm, relocate opening from kitchen-hallwy; bathroom remodel, relocate fixtures, entry door to hallwy, install (2)new lightwell windows in (e)location, remove/fill (2)windows-hall closet & dining rm | $140,000 |
| Aug 15, 2022 | Completed final sign-off Jun 2023 | 2830 Santiago St | garage level: convert existing bonus room to living space including bedroom, bathroom. build new demising walls to create a bedroom, bathroom, and closet. install new patio door. install new window in bedroom. provide exhaust fan for bathroom.Details
garage level: convert existing bonus room to living space including bedroom, bathroom. build new demising walls to create a bedroom, bathroom, and closet. install new patio door. install new window in bedroom. provide exhaust fan for bathroom. | $52,000 |
| May 14, 2019 | Completed final sign-off Oct 2019 | 3037 Wawona St | remodel master bath. replace tub w/ shower stall, new vanity base. replace hinged door w/ pocket door.Details
remodel master bath. replace tub w/ shower stall, new vanity base. replace hinged door w/ pocket door. | $12,000 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 2979 Jackson St | new garage, garage door, curb cut, foundation work, new interior stair, remodel extg kitchen and bathroom, new plumbing and electrical as needed. ref app#207004913 env. n/a for maher. no building enlargement.Details
new garage, garage door, curb cut, foundation work, new interior stair, remodel extg kitchen and bathroom, new plumbing and electrical as needed. ref app#207004913 env. n/a for maher. no building enlargement. | $61,000 |
| Sep 22, 2016 | Completed final sign-off May 2017 | 135 Amber Dr | 1 bathroom and kitchen remodel. relocate sink & range. new cabinets and counter tops. bathroom-new fixture & tile work. dry rot repair at front of building above entrance. no structural work. repair in "like-kind"Details
1 bathroom and kitchen remodel. relocate sink & range. new cabinets and counter tops. bathroom-new fixture & tile work. dry rot repair at front of building above entrance. no structural work. repair in "like-kind" | $32,000 |
| Jun 2, 2016 | Completed final sign-off Jul 2016 | 1730 48th Av | kitchen and bathroom remodel. replace kitchen cabinets and counter tops. replace bathroom fixtures and tiles. no structural work.Details
kitchen and bathroom remodel. replace kitchen cabinets and counter tops. replace bathroom fixtures and tiles. no structural work. | $18,000 |
| Dec 9, 2013 | Completed final sign-off Nov 2014 | 1524 Lombard St | remodel of kitchen & bathroom of existing 350 sq ft ground level apartment & repalce existing 2 rear windows.Details
remodel of kitchen & bathroom of existing 350 sq ft ground level apartment & repalce existing 2 rear windows. | $22,500 |
| May 10, 2012 | Completed final sign-off Dec 2013 | 2066 33rd Av | remove and replace plumbing fixtures/valves and faucets in kitchen and 2 bathrooms. new cabinets in kitchen and both bathrooms. remove wall between kitchen dining area and living room. rework wall through closet on 2nd floor. remove door in lower floor bathroom and install new window not visibleDetails
remove and replace plumbing fixtures/valves and faucets in kitchen and 2 bathrooms. new cabinets in kitchen and both bathrooms. remove wall between kitchen dining area and living room. rework wall through closet on 2nd floor. remove door in lower floor bathroom and install new window not visible | $36,000 |
| Jun 6, 2008 | Completed final sign-off Oct 2008 | 631 Cayuga Av | main floor hall bathroom remodel-strip walls + ceiling to studs. install (3) new plugs. (3) lighting fixtures + related switches. remove tub + install double sinks. shower + toilet to remain in same location. insulate as required. install new gypsum board throughtout. tile floor/wainscott + showerDetails
main floor hall bathroom remodel-strip walls + ceiling to studs. install (3) new plugs. (3) lighting fixtures + related switches. remove tub + install double sinks. shower + toilet to remain in same location. insulate as required. install new gypsum board throughtout. tile floor/wainscott + shower | $35,000 |
| Aug 29, 2006 | Completed final sign-off Dec 2006 | 329 Wawona St | remodel main hall bathroom. new fixtures to be installed in existing locations. no structural changes.Details
remodel main hall bathroom. new fixtures to be installed in existing locations. no structural changes. | $14,000 |
| Mar 23, 2005 | Completed final sign-off Sep 2005 | 916 Silliman St | bathroom remodel - relocate water closet & lavy, revise tubDetails
bathroom remodel - relocate water closet & lavy, revise tub | $13,000 |
| Sep 30, 2003 | Completed final sign-off Dec 2003 | 126 Joost Av | remodel hall bathroom install new tub/valvenew water closet.new lavy + valve. install tile at tubDetails
remodel hall bathroom install new tub/valvenew water closet.new lavy + valve. install tile at tub | $8,000 |
| Sep 25, 2003 | Completed final sign-off Dec 2005 | 3406 Clay St | remodel ground floor level. relocate bathroom & laundry room replace windows & doorsDetails
remodel ground floor level. relocate bathroom & laundry room replace windows & doors | $97,000 |
| Apr 7, 2003 | Completed final sign-off Sep 2003 | 85 El Plazuela Wy | too fl. main hall bath: remove lath/plaster fm walls/ceiling. extend copper water pipe. install newDetails
too fl. main hall bath: remove lath/plaster fm walls/ceiling. extend copper water pipe. install new | $7,000 |
| Aug 7, 2002 | Completed final sign-off Sep 2002 | 421 Taraval St | upgrade bathroom,new tub,extend existing copper through walls to lavy-water closet-tub-kitchen sinkDetails
upgrade bathroom,new tub,extend existing copper through walls to lavy-water closet-tub-kitchen sink | $8,000 |
| Jul 8, 2002 | Expired or cancelled expired Nov 2003 | 916 Lake St | run new electrical to kitchens and baths install new sink base lower cabinets in upper floor flatDetails
run new electrical to kitchens and baths install new sink base lower cabinets in upper floor flat | $18,000 |