Back to bathroom remodel contractors
Lindele Construction Co, Inc
- Based in
- Sacramento
- On San Francisco permits
- Jun 2001 to Sep 2014
- Last 24 months
- 0 permits filed
22 permits since 2000: 14 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 237 Arguello Bl | bathroom remodel: remove & replace existing equipment, no change in location. lighting must comply with cec150(k)Details
bathroom remodel: remove & replace existing equipment, no change in location. lighting must comply with cec150(k) | $18,000 |
| Mar 11, 2011 | Completed final sign-off Jul 2011 | 2619 43rd Av | add new bathroom & closet space (to adjoin (e) lower bedroom) to (e) interior area of garage. legalize (e) habitable space on garage levelDetails
add new bathroom & closet space (to adjoin (e) lower bedroom) to (e) interior area of garage. legalize (e) habitable space on garage level | $30,000 |
| Oct 14, 2009 | Completed final sign-off Aug 2010 | 152 Lombard St | unit# 703 at 7th floor. interior remodel of approx. 1,150 sqft incl casework in kitchen, laundry, master bath, bath#2. partial demo of non bearing wall in kitchen. addition of mantle in lv room fire place. redo floor finishes.Details
unit# 703 at 7th floor. interior remodel of approx. 1,150 sqft incl casework in kitchen, laundry, master bath, bath#2. partial demo of non bearing wall in kitchen. addition of mantle in lv room fire place. redo floor finishes. | $75,000 |
| Sep 12, 2007 | Completed final sign-off Jan 2008 | 1030 Chestnut St | 1 master bath remodel only. new fixtures only. upgrade electrical & sub pannel. upgrade plumbing fixtures & valves. locations to remain the same. new tile.Details
1 master bath remodel only. new fixtures only. upgrade electrical & sub pannel. upgrade plumbing fixtures & valves. locations to remain the same. new tile. | $18,500 |
| Jun 25, 2001 | Expired or cancelled expired Dec 2001 | 333 Bush St | kitchen/bath remodelDetails
kitchen/bath remodel | $20,000 |
| Jun 25, 2001 | Expired or cancelled cancelled Oct 2024 | 333 Bush St | remove bathtub,replace w/ shower,replumb supply & dwv.add 2 lights in bath.re-tile bath.replace counDetails
remove bathtub,replace w/ shower,replumb supply & dwv.add 2 lights in bath.re-tile bath.replace coun | $20,000 |