Back to kitchen remodel contractors
Left Coast Constructoin
- Based in
- Livermore
- On San Francisco permits
- Jun 2023 to Jun 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 7 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2023 | Completed final sign-off Sep 2023 | 98 Chaves Av | in-kind kitchen remodel (2)bath remodel, replace windows-in kind (facing front). upgrade plumbing in kitchen and bathrooms, update cosmetic fixtures: kitchen cabintry, pluming fixtures, baseboards, interior doors.Details
in-kind kitchen remodel (2)bath remodel, replace windows-in kind (facing front). upgrade plumbing in kitchen and bathrooms, update cosmetic fixtures: kitchen cabintry, pluming fixtures, baseboards, interior doors. | $90,000 |