Leafair Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to May 2026
- Last 24 months
- 4 permits filed
9 permits since 2000: 5 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress filed May 2026, not yet issued | 99 Manchester St | remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and..Details
remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and.. | $100,000 |
| Oct 8, 2025 | In progress issued Oct 2025 | 4645 Anza St | interior remodeling: e) kitchen & e) bathrooms by changing layout, new interior stairs, replacing e) windows in-kindDetails
interior remodeling: e) kitchen & e) bathrooms by changing layout, new interior stairs, replacing e) windows in-kind | $300,000 |