Back to kitchen remodel contractors
Leader Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 3 permits filed
43 permits since 2000: 35 completed, 1 in progress, 7 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 16 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off May 2025 | 3918 26th St | replace kitchen cabinets, sink, and faucet. upgrade electrical panel.Details
replace kitchen cabinets, sink, and faucet. upgrade electrical panel. | $8,000 |
| Dec 1, 2023 | Completed final sign-off Jun 2024 | 254 Felton St | revision to pa202308235088. convert media room to kitchenette. add office, replace and lower front window with (2) windows to meet egress.Details
revision to pa202308235088. convert media room to kitchenette. add office, replace and lower front window with (2) windows to meet egress. | $8,000 |
| Sep 15, 2023 | Expired or cancelled expired Feb 2026 | 1455 Monterey Bl | revision to bp #202211227016. new electrical panel/wiring. sheetrock/insualtion. remodel kitchen.Details
revision to bp #202211227016. new electrical panel/wiring. sheetrock/insualtion. remodel kitchen. | |
| Oct 20, 2022 | Completed final sign-off Jan 2023 | 1735 24th Av | one kitchen remodel. non structuralDetails
one kitchen remodel. non structural | $12,000 |
| Sep 14, 2022 | Completed final sign-off Nov 2022 | 168 Farallones St | legalize 1 bedroom, one full bathroom & media room. install kitchenette. all work on g/f. 4 total bedrooms for r-3/27.Details
legalize 1 bedroom, one full bathroom & media room. install kitchenette. all work on g/f. 4 total bedrooms for r-3/27. | $75,000 |
| Sep 14, 2022 | Completed final sign-off Nov 2022 | 1 Daniel Burnham Ct | kitchen cabinet: replace bathroom vanity cabinetDetails
kitchen cabinet: replace bathroom vanity cabinet | $4,000 |
| Apr 1, 2022 | Completed final sign-off Dec 2024 | 884 43rd Av | 1st floor:new bathroom, new bedroom, and laundry room. at 2nd floor: remodel, relocated kitchen and bedroonm. new bathroom and 1 level deck at rear.Details
1st floor:new bathroom, new bedroom, and laundry room. at 2nd floor: remodel, relocated kitchen and bedroonm. new bathroom and 1 level deck at rear. | $75,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 781 Corbett Av | unit #2: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at second floor. unit #4: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at third floor.Details
unit #2: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at second floor. unit #4: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at third floor. | $60,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 781 Corbett Av | unit #1: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at ground floor.Details
unit #1: relocate (e) kitchen. convert (e) kitchen space into bedroom & remodel (e) bathroom at ground floor. | $30,000 |
| Jul 28, 2021 | Completed final sign-off Aug 2022 | 21 Toyon Ln | create 1 new openings at rear non visible to the street. add 1 new bath, alter (e) bath. remodel (e) kitchen, living/ dining rm. (n) patio steps less than 30" @ rear.Details
create 1 new openings at rear non visible to the street. add 1 new bath, alter (e) bath. remodel (e) kitchen, living/ dining rm. (n) patio steps less than 30" @ rear. | $45,000 |
| Jul 1, 2019 | Completed final sign-off Nov 2019 | 3715 Alemany Bl | remove bath tub and replace with shower, change fauct, tile installation, 5x7.5 kitchen repair counter, change outlets. remodel kitchen, replace existing cabinets, no relocation of walls. approx 8x12.Details
remove bath tub and replace with shower, change fauct, tile installation, 5x7.5 kitchen repair counter, change outlets. remodel kitchen, replace existing cabinets, no relocation of walls. approx 8x12. | $6,000 |
| Nov 20, 2018 | Completed final sign-off Jan 2020 | 555 Edinburgh St | 1)remodel extg kitchen and remove partition walls at 2nd floor. 2)remodel extg bath room and add 2 new bath rooms at 2nd floor. 3)infill extg lightwell at 2nd floor.Details
1)remodel extg kitchen and remove partition walls at 2nd floor. 2)remodel extg bath room and add 2 new bath rooms at 2nd floor. 3)infill extg lightwell at 2nd floor. | $36,000 |
| Nov 21, 2017 | Completed final sign-off Aug 2018 | 7420 Geary Bl | construct 2 bedrooms and 2 full bathrooms, 1 half bath & laundry area at ground level. remodel (e) kitchen. convert (e) one bath to two full bathrooms. create hallway for 3rd bedroom at 2nd flr.Details
construct 2 bedrooms and 2 full bathrooms, 1 half bath & laundry area at ground level. remodel (e) kitchen. convert (e) one bath to two full bathrooms. create hallway for 3rd bedroom at 2nd flr. | $83,000 |
| Mar 10, 2017 | Completed final sign-off May 2017 | 50 Stanyan St | unit 205 -kitchen remodel same to sameDetails
unit 205 -kitchen remodel same to same | $10,000 |
| Feb 24, 2017 | Completed final sign-off Apr 2024 | 47 Rey St | legalization of dweling unit installed without permit, per unit legalization ord 43-14. legalize existing kitchen, all work at ground floor.Details
legalization of dweling unit installed without permit, per unit legalization ord 43-14. legalize existing kitchen, all work at ground floor. | $8,000 |
| Jul 19, 2016 | Completed final sign-off Apr 2017 | 1377 19th Av | legalize two (e) bedroom, construct one office room, storage room, two half bath room & laundry room at ground floor. remodel (e) kitchen, convert one (e) bathroom into two full bathroom & dining room into new bedroom at 2nd floor.Details
legalize two (e) bedroom, construct one office room, storage room, two half bath room & laundry room at ground floor. remodel (e) kitchen, convert one (e) bathroom into two full bathroom & dining room into new bedroom at 2nd floor. | $68,000 |
| Mar 24, 2015 | Completed final sign-off Nov 2015 | 3315 Anza St | remodel e kitchen, bath, 1 new full bath at 2nd/3rd fl. rewire elec lighting for 2nd/3rd flDetails
remodel e kitchen, bath, 1 new full bath at 2nd/3rd fl. rewire elec lighting for 2nd/3rd fl | $60,000 |