Lavan Construction
- Based in
- San Jose
- On San Francisco permits
- May 2021 to Dec 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 4 days from filing to permit and 494 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2022 | Completed final sign-off Aug 2023 | 2 Vulcan Sw | revision to pa# 2021-0503-9687: reflect field conditions replace interior stairs in kind & framing changes per planDetails
revision to pa# 2021-0503-9687: reflect field conditions replace interior stairs in kind & framing changes per plan | |
| Jun 22, 2021 | Completed final sign-off Dec 2022 | 2 Vulcan Sw | replacement of 24 windows throughout house with retrofit windows. some facing street. same size & location. windows on ord ct ord street and vulcan stairway will be wood aluminum clad windows.Details
replacement of 24 windows throughout house with retrofit windows. some facing street. same size & location. windows on ord ct ord street and vulcan stairway will be wood aluminum clad windows. | $23,000 |