Back to bathroom remodel contractors
Landi Construction Company
- Based in
- Pacifica
- On San Francisco permits
- Sep 2007 to Jul 2009
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 22 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2008 | Completed final sign-off Jan 2009 | 288 Naples St | remodel bathroom: new sheetrock plumbing, elec, fixtures. remodel kitchen: partial sheetrock plumbing, elec, hood, cabinets & countertop. replace 5 windows in l.v. kit at rear & bathroom. replace entry door to courtyard. check & replace any moisture penetrate sheetrock or plaster. repair any dryrotDetails
remodel bathroom: new sheetrock plumbing, elec, fixtures. remodel kitchen: partial sheetrock plumbing, elec, hood, cabinets & countertop. replace 5 windows in l.v. kit at rear & bathroom. replace entry door to courtyard. check & replace any moisture penetrate sheetrock or plaster. repair any dryrot | $28,000 |
| Nov 16, 2007 | Completed final sign-off Jul 2008 | 3745 Divisadero St | unit #4: remodel kitchen including: (n) cabinets, (n) sink,(n) flooirng, (n) plywood, (n) gypsum wallboard and bathroom including (n) fixtures, (n) flooring, (n) pluwood, (n) gypsum wallborad. other rooms selective demo, (n)wiring & plbg.Details
unit #4: remodel kitchen including: (n) cabinets, (n) sink,(n) flooirng, (n) plywood, (n) gypsum wallboard and bathroom including (n) fixtures, (n) flooring, (n) pluwood, (n) gypsum wallborad. other rooms selective demo, (n)wiring & plbg. | $12,000 |
| Sep 26, 2007 | Completed final sign-off Jul 2008 | 3745 Divisadero St | volentary structural strengthening & remodel unit 5.replace 18 windows in kitchens, bathrooms and dining rooms.Details
volentary structural strengthening & remodel unit 5.replace 18 windows in kitchens, bathrooms and dining rooms. | $40,000 |