Block 0914, lot 001C
3745 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 6,045 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 3745 Divisadero St | American Standard Roofing Inc | re roofing: no hot works.Details
re roofing: no hot works. | $20,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 3745 Divisadero St | to verify (e) sound levels in sleeping areas. complying with sffc section 1103.7.6.1.Details
to verify (e) sound levels in sleeping areas. complying with sffc section 1103.7.6.1. | ||
| Jun 9, 2022 | Completed final sign-off Dec 2022 | 3745 Divisadero St | R M Remodeling Inc | unit 1 - remodel kitchen remove all lath & plaster of walls and replace with gypsum wall board @ ceiling. selectively remove lath & plaster & replace plaster. (n) cabinets, fixtures & flooring. add voluntary structural strengthening to walls of kitchenDetails
unit 1 - remodel kitchen remove all lath & plaster of walls and replace with gypsum wall board @ ceiling. selectively remove lath & plaster & replace plaster. (n) cabinets, fixtures & flooring. add voluntary structural strengthening to walls of kitchen | $20,000 |
| Apr 18, 2016 | Completed final sign-off Apr 2016 | 3745 Divisadero St | Tn Building | replace dryrot at north stair from ground level to 1st story. n/a for maherDetails
replace dryrot at north stair from ground level to 1st story. n/a for maher | $3,500 |
| May 11, 2009 | Completed final sign-off Jul 2009 | 3745 Divisadero St | Landi Construction Company | voluntary structural includes fbm #3 & #4 along w/their assoc holddown connect posts, holddown &posts near trash rm 108 & 2 holddown conncect,posts & property line & 3 holddowns in rear 35' of nrth property line & 3 holddowns in rear 35' of south property line. ref plans #200711168407 & 200804089096Details
voluntary structural includes fbm #3 & #4 along w/their assoc holddown connect posts, holddown &posts near trash rm 108 & 2 holddown conncect,posts & property line & 3 holddowns in rear 35' of nrth property line & 3 holddowns in rear 35' of south property line. ref plans #200711168407 & 200804089096 | $6,000 |
| Jun 18, 2008 | Never finaled issued Jun 2008, no final | 3745 Divisadero St | street space permit only.Details
street space permit only. | ||
| Apr 8, 2008 | Completed final sign-off Jul 2008 | 3745 Divisadero St | Landi Construction Company | permit to clarify work not performed described. update records to list special inspections for pa# 2007-1116-8407, delete plywd @passagewy 101, delete 3 & 4 hold downs/post @trash 106 along w/respective hold downs/connections. delete phd5's on no/east walls in kitchen 320, delete roof work-402,Details
permit to clarify work not performed described. update records to list special inspections for pa# 2007-1116-8407, delete plywd @passagewy 101, delete 3 & 4 hold downs/post @trash 106 along w/respective hold downs/connections. delete phd5's on no/east walls in kitchen 320, delete roof work-402, | |
| Nov 16, 2007 | Completed final sign-off Jul 2008 | 3745 Divisadero St | Landi Construction Company | unit #4: remodel kitchen including: (n) cabinets, (n) sink,(n) flooirng, (n) plywood, (n) gypsum wallboard and bathroom including (n) fixtures, (n) flooring, (n) pluwood, (n) gypsum wallborad. other rooms selective demo, (n)wiring & plbg.Details
unit #4: remodel kitchen including: (n) cabinets, (n) sink,(n) flooirng, (n) plywood, (n) gypsum wallboard and bathroom including (n) fixtures, (n) flooring, (n) pluwood, (n) gypsum wallborad. other rooms selective demo, (n)wiring & plbg. | $12,000 |
| Sep 26, 2007 | Completed final sign-off Jul 2008 | 3745 Divisadero St | Landi Construction Company | volentary structural strengthening & remodel unit 5.replace 18 windows in kitchens, bathrooms and dining rooms.Details
volentary structural strengthening & remodel unit 5.replace 18 windows in kitchens, bathrooms and dining rooms. | $40,000 |
| Sep 26, 2007 | Completed final sign-off Dec 2007 | 3745 Divisadero St | Tyrrell Construction | renew 200703085799 for final inspectionDetails
renew 200703085799 for final inspection | |
| Jun 26, 2007 | Never finaled issued Jun 2007, no final | 3745 Divisadero St | street spaceDetails
street space | ||
| Jun 21, 2007 | Completed final sign-off Aug 2007 | 3745 Divisadero St | Northwest Security Inc. | modification of "local only" fire alarm system, install fire horn in bedroom of each unit, change hall horns to horn/strobes, replace smoke detectors. (e) fire control & pull station & power source to remain as is.Details
modification of "local only" fire alarm system, install fire horn in bedroom of each unit, change hall horns to horn/strobes, replace smoke detectors. (e) fire control & pull station & power source to remain as is. | $1,800 |
| May 25, 2007 | Completed final sign-off Dec 2007 | 3745 Divisadero St | Tyrrell Construction | apt 2 - remodel bath-new fixtures. remodel kitchen-new cabinets, close kitchen door. add new door's 2nd & 3rd floor stairwell.Details
apt 2 - remodel bath-new fixtures. remodel kitchen-new cabinets, close kitchen door. add new door's 2nd & 3rd floor stairwell. | $20,000 |
| Apr 25, 2007 | Completed final sign-off Aug 2007 | 3745 Divisadero St | Tyrrell Construction | remove & replace windows rear of building same size & location. u factor max=0.67. apt #2,4,6. 18 windows.Details
remove & replace windows rear of building same size & location. u factor max=0.67. apt #2,4,6. 18 windows. | $19,000 |
| Mar 8, 2007 | Expired or cancelled expired Dec 2007 | 3745 Divisadero St | Tyrrell Construction | add wood plywood panels to walls of kitchen bathroom, and living of unit 6. in units 5 & 6 remove kitchen door to stair #402 add door between staqir 401, 402 16 ohd5's w/6/6 rod for future cionnectio ot unit below. main work under 200702264861Details
add wood plywood panels to walls of kitchen bathroom, and living of unit 6. in units 5 & 6 remove kitchen door to stair #402 add door between staqir 401, 402 16 ohd5's w/6/6 rod for future cionnectio ot unit below. main work under 200702264861 | $5,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 3745 Divisadero St | Tyrrell Construction | kchn:remove and replace plaster new cabinet and flooring. bath: remove and replace plaster, new tub , new sink, new toilet, fan and flooring. rooms: new plugs. work in unit #6. life safty under seperate permit.Details
kchn:remove and replace plaster new cabinet and flooring. bath: remove and replace plaster, new tub , new sink, new toilet, fan and flooring. rooms: new plugs. work in unit #6. life safty under seperate permit. | $25,000 |
| Jan 3, 2007 | Completed final sign-off Feb 2007 | 3745 Divisadero St | renew pa# 9005891 for final inspection onlyDetails
renew pa# 9005891 for final inspection only | ||
| Oct 19, 2006 | Completed final sign-off Jan 2007 | 3745 Divisadero St | Tyrrell Construction | apt. 1: (bathroom) remove plaster and replace with sheetrock, new tub & faucet, new fan, new plug, new sink and toilet (dining room) two new plugs, (living room) 3 new plugs, (bedroom) 3 new plugs (hall) smoke detector, shearwall two walls in bathroom (kitchen) new fanDetails
apt. 1: (bathroom) remove plaster and replace with sheetrock, new tub & faucet, new fan, new plug, new sink and toilet (dining room) two new plugs, (living room) 3 new plugs, (bedroom) 3 new plugs (hall) smoke detector, shearwall two walls in bathroom (kitchen) new fan | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.