Lam Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Apr 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 19 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2012 | Completed final sign-off May 2012 | 955 Portola Dr | 2' foundation cap above grade level at walkway door. replace door, interior stairway window. reivision to 201204107969Details
2' foundation cap above grade level at walkway door. replace door, interior stairway window. reivision to 201204107969 | $4,850 |