Back to kitchen remodel contractors
La Torre General Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2012 to May 2026
- Last 24 months
- 2 permits filed
4 permits since 2000: 1 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 2 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | In progress issued Dec 2025 | 2405 Pacific Av | replacement of ext 3/f deck with new and metal stair, partiral seismic retrofit on 1/f garage,kitchen/laundry rm remodels on 3/f,removal of int wall at 2/f dining area,replacement of (e) ext stair and replacement of (e) ext window/doors. reduce deck size.modification to issued permit 202012070396Details
replacement of ext 3/f deck with new and metal stair, partiral seismic retrofit on 1/f garage,kitchen/laundry rm remodels on 3/f,removal of int wall at 2/f dining area,replacement of (e) ext stair and replacement of (e) ext window/doors. reduce deck size.modification to issued permit 202012070396 | $200,000 |
| Jul 20, 2012 | Completed final sign-off Dec 2012 | 601 Van Ness Av | replace bathtub/tile bathroom floors & wall enclosure. (e) exit fan to remain in bathroom, replace kitchen cabinets/appliances/sink/counter, (n) kitchen hood above range & flourescent lights, replace carpet with bamboo flooring.Details
replace bathtub/tile bathroom floors & wall enclosure. (e) exit fan to remain in bathroom, replace kitchen cabinets/appliances/sink/counter, (n) kitchen hood above range & flourescent lights, replace carpet with bamboo flooring. | $6,700 |