Back to bathroom remodel contractors
L T Energy Construction Solutions Inc
- Based in
- Groveland
- On San Francisco permits
- Jan 2015 to Jun 2016
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2016 | Completed final sign-off May 2017 | 1244 30th Av | construction new full bathroom, media/office and convert office area into bedroom on ground floor. garage area.Details
construction new full bathroom, media/office and convert office area into bedroom on ground floor. garage area. | $20,000 |
| Jan 22, 2016 | Completed final sign-off Feb 2017 | 228 Lake Merced Hill St North St | bathroom remodel - replace tiles, bathtub & shower. kitchen remodel - replace cabinets, appliances & counter tops. no walls moved, removed, added or installed. all existing layouts to remain unchanged.Details
bathroom remodel - replace tiles, bathtub & shower. kitchen remodel - replace cabinets, appliances & counter tops. no walls moved, removed, added or installed. all existing layouts to remain unchanged. | $35,000 |
| Feb 19, 2015 | Completed final sign-off Oct 2015 | 2275 Francisco St | #301 - kitchen and bathroom remodel; and windows replacement not facing front of the house; to comply with cec150.0(k)3& 5; u factor not > .32Details
#301 - kitchen and bathroom remodel; and windows replacement not facing front of the house; to comply with cec150.0(k)3& 5; u factor not > .32 | $6,000 |
| Feb 19, 2015 | Completed final sign-off Oct 2015 | 2275 Francisco St | #101 - kitchen and bathroom remodel; windows replacement that not facing front of the property; to comply with cec150.0(k)3 & 5; u factor not > .32Details
#101 - kitchen and bathroom remodel; windows replacement that not facing front of the property; to comply with cec150.0(k)3 & 5; u factor not > .32 | $6,000 |
| Jan 29, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | kitchen and bathroom remodel, change tile, surface and bathroom walls around tub. no walls to be removed/no structural. finishes only. call districk inspector prior to start work.Details
kitchen and bathroom remodel, change tile, surface and bathroom walls around tub. no walls to be removed/no structural. finishes only. call districk inspector prior to start work. | $2,500 |
| Jan 12, 2015 | Completed final sign-off Dec 2015 | 494 27th Av | unit 1 - bathroom remodel; and kitchen remodel. to comply with cec150.0(k)5Details
unit 1 - bathroom remodel; and kitchen remodel. to comply with cec150.0(k)5 | $2,000 |