L E C A Construction Llc
- Based in
- San Mateo
- On San Francisco permits
- Dec 2012 to Jun 2026
- Last 24 months
- 10 permits filed
44 permits since 2000: 33 completed, 6 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 90 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Sep 2026 | 906 Broadway | conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stairDetails
conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair | $220,000 |
| May 30, 2024 | Completed final sign-off Aug 2024 | 1702 Fell St | common area: rear stairway railing repair in-kind. less than 50%Details
common area: rear stairway railing repair in-kind. less than 50% | $35,000 |
| Dec 13, 2012 | Completed final sign-off Dec 2013 | 3790 16th St | replacement of front entry stairs & entry porch landing ( common area to both units) units are condos.Details
replacement of front entry stairs & entry porch landing ( common area to both units) units are condos. | $12,000 |