Kurt Jehling Construction
- Based in
- Corte Madera
- On San Francisco permits
- Aug 2014 to Jul 2016
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2016 | Completed final sign-off Jun 2017 | 150 Yerba Buena Av | master suite interior remodel, new windows (change in size) at rear & side - not visible from street, no structural work.Details
master suite interior remodel, new windows (change in size) at rear & side - not visible from street, no structural work. | $62,000 |
| Jun 24, 2015 | Never finaled issued Jun 2015, no final | 1967 29th Av | replace (e) property line skylight w/new unit w/one operable lite, rebuild skylight curb, build (n) 1-hr rated parapet wall @ south property line. patch roof as required.Details
replace (e) property line skylight w/new unit w/one operable lite, rebuild skylight curb, build (n) 1-hr rated parapet wall @ south property line. patch roof as required. | $8,000 |
| Aug 29, 2014 | Completed final sign-off Jun 2015 | 1967 29th Av | interior renovation of (e) 1st floor: renovate 1 (e) bath, eliminate 1 (e) bathroom, enlarge (e) closet, add entry security gate. 2nd flr: renovate (e) kitchen, renovate 2 (e) bathrooms. electrical & plumbing work as req'd @ bht floors. no structural work, no change to doors/windows.Details
interior renovation of (e) 1st floor: renovate 1 (e) bath, eliminate 1 (e) bathroom, enlarge (e) closet, add entry security gate. 2nd flr: renovate (e) kitchen, renovate 2 (e) bathrooms. electrical & plumbing work as req'd @ bht floors. no structural work, no change to doors/windows. | $88,000 |