Back to kitchen remodel contractors
Kriscraft Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Dec 2025
- Last 24 months
- 4 permits filed
6 permits since 2000: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 212 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off Oct 2026 | 563 Waller St | kitchen and bathroom remodel, additional 1/2 bathroom added and replacement of 5 windows at side lightwell of property (non street facing).Details
kitchen and bathroom remodel, additional 1/2 bathroom added and replacement of 5 windows at side lightwell of property (non street facing). | $250,000 |
| Feb 8, 2022 | Never finaled issued Jan 2023, no final | 2643 16th Av | 1st floor: ground floor development includes new bedroom, closet, 1 1/2 bathrooms, study and family room. one story rear addition and infill under sunroom. new interior stair. rated exit corridor added to garage 2nd floor: remodel (e) kitchen and (e) bathroom, add skylightsDetails
1st floor: ground floor development includes new bedroom, closet, 1 1/2 bathrooms, study and family room. one story rear addition and infill under sunroom. new interior stair. rated exit corridor added to garage 2nd floor: remodel (e) kitchen and (e) bathroom, add skylights | $194,727 |