Back to kitchen remodel contractors
Kolby Development
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jun 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 1 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2024 | Completed final sign-off Feb 2025 | 75 Justin Dr | 2nd fl interior remodel. master bath addition, some partial wall removal and some new partition wall. new master bath closet. remodel kitchen.Details
2nd fl interior remodel. master bath addition, some partial wall removal and some new partition wall. new master bath closet. remodel kitchen. | $25,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383.Details
kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383. | $45,000 |
| Jun 14, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. installing gas line. | $97,000 |
| Dec 19, 2019 | Completed final sign-off Sep 2020 | 400 Goettingen St | revision to app#201804025255. remodel of 1st floor: convert extg den to storage to new children multi purpose room for in home daycare (15 children or less). remodel extg bathroom, nw laundry room, replace extg rear yard patio and gravel with sod. remodel of 2nd floor: remodel extg kitchen new bathDetails
revision to app#201804025255. remodel of 1st floor: convert extg den to storage to new children multi purpose room for in home daycare (15 children or less). remodel extg bathroom, nw laundry room, replace extg rear yard patio and gravel with sod. remodel of 2nd floor: remodel extg kitchen new bath | |
| Apr 2, 2018 | Completed final sign-off Sep 2020 | 400 Goettingen St | conversion of first floor into childcare of 14 and less children, upgrades to second floor bathroom, (n) bathroom, kitchen and bedroom renovation, replacement of stair case, rear yard renovation.Details
conversion of first floor into childcare of 14 and less children, upgrades to second floor bathroom, (n) bathroom, kitchen and bedroom renovation, replacement of stair case, rear yard renovation. | $170,000 |
| Mar 6, 2015 | Completed final sign-off Aug 2015 | 631 O'farrell St | unit #611: kitchen remodel include new cabinets, counter, tile floor, lighting, add new dishwasher and microwave hood. remove parting walls per plan. maher n/a.Details
unit #611: kitchen remodel include new cabinets, counter, tile floor, lighting, add new dishwasher and microwave hood. remove parting walls per plan. maher n/a. | $15,000 |
| May 20, 2014 | Completed final sign-off Aug 2014 | 60 Rausch St | remodel e bathroom and kitchen. extend e 1/2 bath to full bath. compliance with ordinance 155-13 not required.Details
remodel e bathroom and kitchen. extend e 1/2 bath to full bath. compliance with ordinance 155-13 not required. | $25,000 |
| May 24, 2013 | Completed final sign-off Sep 2013 | 85 Western Shore Ln | kitchen remodel - remove old cabinets, add lighting, countertop and update flooring. bathroom 1 - update flooring, install new vanity, new toilet and shower. bathroom 2 - remove rub, toilet, vanity and replace with new tub, shower vanity and toilet.Details
kitchen remodel - remove old cabinets, add lighting, countertop and update flooring. bathroom 1 - update flooring, install new vanity, new toilet and shower. bathroom 2 - remove rub, toilet, vanity and replace with new tub, shower vanity and toilet. | $60,000 |
| Mar 22, 2011 | Completed final sign-off Jul 2011 | 72 Elsie St | remodel kitchen & bathroom-finishes & fixtures, replace (e) single glazed windows with new dual glazed vinyl windows within (e) window opening. front windows replace with wood dual glazed double hung. upgrade electrical panel;front wins repl (e) wood with (n) wd dual glazed dble hungDetails
remodel kitchen & bathroom-finishes & fixtures, replace (e) single glazed windows with new dual glazed vinyl windows within (e) window opening. front windows replace with wood dual glazed double hung. upgrade electrical panel;front wins repl (e) wood with (n) wd dual glazed dble hung | $70,000 |