Back to kitchen remodel contractors
Kohlmyer
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Oct 2026
- Last 24 months
- 8 permits filed
119 permits since 2000: 91 completed, 2 in progress, 16 never finaled, 10 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 17 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 14 days from filing to permit and 396 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | In progress filed May 2026, not yet issued | 60 Piedmont St | create basement space at 8'4" ceiling height in parts of (e) cellar space. expand rear partition of bldg 3'93/4" to north, enlarging kitchen on level (l1). level 2 convert study & closet intro primary bathroom. l1 and l2 to attic space into playroom and storage. new staircase from basement to l2Details
create basement space at 8'4" ceiling height in parts of (e) cellar space. expand rear partition of bldg 3'93/4" to north, enlarging kitchen on level (l1). level 2 convert study & closet intro primary bathroom. l1 and l2 to attic space into playroom and storage. new staircase from basement to l2 | $400,000 |
| Apr 4, 2023 | Completed final sign-off Jun 2026 | 742 Elizabeth St | 2-story rear addition. depth is 8'-1". includes relocating (1) bathroom, remodel 3rd fl bathroom #2; kitchen remodel. (n) windows & doors @ rear addition only. no work visible from street.Details
2-story rear addition. depth is 8'-1". includes relocating (1) bathroom, remodel 3rd fl bathroom #2; kitchen remodel. (n) windows & doors @ rear addition only. no work visible from street. | $245,000 |
| Jan 24, 2023 | Completed final sign-off Aug 2024 | 1215 Vallejo St | (p) project of top floor unit (1215).relocate kitchen,remove central rear wall & remodel of 2 bathrooms;conversion of 2 rear bedrms into a primary suite @ 2nd fl (1217) w/ the relocationof laundry rm on this fl;all work w/in (e) envelope.(n)insulation,sheetrock,(n) systems.replace in-kind 4 front wdDetails
(p) project of top floor unit (1215).relocate kitchen,remove central rear wall & remodel of 2 bathrooms;conversion of 2 rear bedrms into a primary suite @ 2nd fl (1217) w/ the relocationof laundry rm on this fl;all work w/in (e) envelope.(n)insulation,sheetrock,(n) systems.replace in-kind 4 front wd | $115,000 |
| Jun 30, 2022 | Completed final sign-off Aug 2024 | 1215 Vallejo St | creation of finished space on the g/f, connect to lower unit (1217) w/open connection interior staircase, all work w/in (e) envelope. new living room, bathroom, and office. relocate kitchen to 1/f, relocate 2/f bathroom, add stoarge to the 1/f accessed at the exterior walkway.Details
creation of finished space on the g/f, connect to lower unit (1217) w/open connection interior staircase, all work w/in (e) envelope. new living room, bathroom, and office. relocate kitchen to 1/f, relocate 2/f bathroom, add stoarge to the 1/f accessed at the exterior walkway. | $80,000 |
| Apr 16, 2021 | Completed final sign-off May 2023 | 332 27th St | kitchen & 2 bathrooms remodel. new hydronic heating throughout. upgrade electrical system. add ventilation. new finishes . flooring, tile, counters & cabinets. no change of layout.Details
kitchen & 2 bathrooms remodel. new hydronic heating throughout. upgrade electrical system. add ventilation. new finishes . flooring, tile, counters & cabinets. no change of layout. | $85,000 |
| Dec 6, 2018 | Completed final sign-off Jan 2020 | 546 Alvarado St | remodel kitchen & remodel 3 bathrooms. new radiant heating throughout, remove & replace ceiling drywall to install, w/ new in-slab heat on the ground floor. new finishes & fixts throughout.Details
remodel kitchen & remodel 3 bathrooms. new radiant heating throughout, remove & replace ceiling drywall to install, w/ new in-slab heat on the ground floor. new finishes & fixts throughout. | $95,000 |
| Oct 20, 2017 | Expired or cancelled expired Aug 2025 | 295 Coso Av | new interior renovations throughtout existing structure, new exterior doors adn windows throughout, new exterior finish renovations, new 3rd fl, vertical addition (new living room, new dining room, new kitchen, new powder)Details
new interior renovations throughtout existing structure, new exterior doors adn windows throughout, new exterior finish renovations, new 3rd fl, vertical addition (new living room, new dining room, new kitchen, new powder) | $350,000 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 1278 24th Av | remodel kitchen cabinets and countertops - no plumbing or electrical work. frame new closet in upstairs bedroom. no structural work to be performed. no alteration of wall, window, and door.Details
remodel kitchen cabinets and countertops - no plumbing or electrical work. frame new closet in upstairs bedroom. no structural work to be performed. no alteration of wall, window, and door. | $4,500 |
| Nov 21, 2014 | Completed final sign-off Feb 2017 | 305 Juanita Wy | horizontal addition @ westside of property; relocate kitchen & add family rm @ 2nd fl; convert unfinished basement to habitable space including 2-bedrooms, 1 bathroom & laundry rm @ 1st fl.Details
horizontal addition @ westside of property; relocate kitchen & add family rm @ 2nd fl; convert unfinished basement to habitable space including 2-bedrooms, 1 bathroom & laundry rm @ 1st fl. | $160,000 |
| Jul 25, 2014 | Expired or cancelled expired Feb 2020 | 54 Naples St | unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan.Details
unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan. | $10,000 |
| May 19, 2014 | Completed final sign-off Oct 2016 | 300 Sussex St | remodel kitchen & 3 bedrooms;work include new cabinets,counters fixtures,flooring and finishes.dryrot repair at baywindow,garage & front stair, new stucco, dry rot repair not exceed 250 sf or more than 3 joists/stud replacement.front stair repair <50% in-kind. no wall relocation.Details
remodel kitchen & 3 bedrooms;work include new cabinets,counters fixtures,flooring and finishes.dryrot repair at baywindow,garage & front stair, new stucco, dry rot repair not exceed 250 sf or more than 3 joists/stud replacement.front stair repair <50% in-kind. no wall relocation. | $65,000 |
| Apr 24, 2014 | Completed final sign-off Sep 2019 | 527 Valley St | vertical & horizontal addition include a master bedroom & bathroom @ 3rd floor. 2 story rear addition include a family room & 2 bedrooms & remodel of (e) kitchen & bathrooms.Details
vertical & horizontal addition include a master bedroom & bathroom @ 3rd floor. 2 story rear addition include a family room & 2 bedrooms & remodel of (e) kitchen & bathrooms. | $275,000 |
| Mar 24, 2014 | Completed final sign-off Jan 2015 | 4194 17th St | alteration to 2 family home. basement: reconfigure garage area & all space to remain unconditional this level, remove center bearing wall & add post & beam. remodel kitchen & bath on both units, add new bath on both units.Details
alteration to 2 family home. basement: reconfigure garage area & all space to remain unconditional this level, remove center bearing wall & add post & beam. remodel kitchen & bath on both units, add new bath on both units. | $105,000 |
| Apr 18, 2013 | Completed final sign-off Dec 2013 | 1774 Church St | conversion of (e) storage space to livable space including bedroom, tv room, wine room & bathroom. remodel of (e) kitchen, bathrooms & other (e) space, install new dual pane windows at rear of house.Details
conversion of (e) storage space to livable space including bedroom, tv room, wine room & bathroom. remodel of (e) kitchen, bathrooms & other (e) space, install new dual pane windows at rear of house. | $250,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2013 | 1774 Church St | remodel kitchen and 3 bathrooms, new cabinets, fixtures, counters and finishes, repl windows at the rear of property with new dual pane windows in existing locations, new lighting fixtures, refinish floors, no walls movedDetails
remodel kitchen and 3 bathrooms, new cabinets, fixtures, counters and finishes, repl windows at the rear of property with new dual pane windows in existing locations, new lighting fixtures, refinish floors, no walls moved | $65,000 |
| Jun 29, 2012 | Expired or cancelled expired Jun 2021 | 4277 25th St | creation of living space in area of current mechanical/laundry/ storage @grd fl. new foundations to repl brick foundation, new concrete slab 20" below the current grade. kitchen, living rm, dining rm moved to 1st floor & new half bathrm. 2nd fl will be converted to bedrms & bathrms, new finishesDetails
creation of living space in area of current mechanical/laundry/ storage @grd fl. new foundations to repl brick foundation, new concrete slab 20" below the current grade. kitchen, living rm, dining rm moved to 1st floor & new half bathrm. 2nd fl will be converted to bedrms & bathrms, new finishes | $180,000 |
| May 1, 2012 | Expired or cancelled expired Jan 2016 | 233 Castenada Av | one kitchen remodel, new cabinets, counters, tile, no walls moved.Details
one kitchen remodel, new cabinets, counters, tile, no walls moved. | $15,000 |
| Feb 22, 2011 | Completed final sign-off Jan 2012 | 369 Day St | 1st fl: remodel bathrm, add (n) full bathm convert storage to master br,(n) int.stairs,add w/d,convert office &hobby rm to 2 bedrms. 2nd fl: remove ful bathrm,rmdl kitchen, new 1/2 bath, convert sun rm to fam rm incl. wall removal. new windows and doors on both floors not visible from streetDetails
1st fl: remodel bathrm, add (n) full bathm convert storage to master br,(n) int.stairs,add w/d,convert office &hobby rm to 2 bedrms. 2nd fl: remove ful bathrm,rmdl kitchen, new 1/2 bath, convert sun rm to fam rm incl. wall removal. new windows and doors on both floors not visible from street | $85,000 |
| Jul 1, 2010 | Completed final sign-off Sep 2011 | 746 Kansas St | remodel kitchen, remodel bathrm, new cabinets, lighting, counters, plumbing, lighting etc, repair water damage and termite damage at living rm and bedrm, no walls moved water damaged joists to be sistered and bolted, termite damage wood to be replaced in kind or with pressure treated as necessary, wDetails
remodel kitchen, remodel bathrm, new cabinets, lighting, counters, plumbing, lighting etc, repair water damage and termite damage at living rm and bedrm, no walls moved water damaged joists to be sistered and bolted, termite damage wood to be replaced in kind or with pressure treated as necessary, w | $55,000 |
| Jun 4, 2010 | Completed final sign-off Aug 2011 | 55 Fountain St | horizontal addition at rear of house. 3 story addition, plus infill under existing sunroom. reconfigure floor plan, new bathroom. remodel kitchen, new interior stairs, new system.Details
horizontal addition at rear of house. 3 story addition, plus infill under existing sunroom. reconfigure floor plan, new bathroom. remodel kitchen, new interior stairs, new system. | $150,000 |
| May 19, 2010 | Completed final sign-off Dec 2010 | 104 Collins St | interior kitchen remodel, new surround at fireplace, shower door at hall bath and 1st fl bath, new wood floors in kitchen and family room, new anchor bolts at e foundation, new closet in e storage gr fl, new plywood at crawl space 2, new interior doors to replace eDetails
interior kitchen remodel, new surround at fireplace, shower door at hall bath and 1st fl bath, new wood floors in kitchen and family room, new anchor bolts at e foundation, new closet in e storage gr fl, new plywood at crawl space 2, new interior doors to replace e | $50,000 |
| Mar 11, 2009 | Never finaled issued Apr 2009, no final | 871 Treat Av | remodel of extg kitchen and bathroom. new exterior window and a door to replace extg at 2nd floor at rear of house.Details
remodel of extg kitchen and bathroom. new exterior window and a door to replace extg at 2nd floor at rear of house. | $50,000 |
| Sep 21, 2004 | Completed final sign-off May 2005 | 2300 Leavenworth St | remodel kitchen & 2 baths -refinish flrs, carpet. no structural workDetails
remodel kitchen & 2 baths -refinish flrs, carpet. no structural work | $45,000 |
| May 20, 2004 | Completed final sign-off Nov 2004 | 3505 23rd St | remodel kitchen,2 bathrooms and laundry room. new counters, cabinets, fixtures, tile sheetrock, lighDetails
remodel kitchen,2 bathrooms and laundry room. new counters, cabinets, fixtures, tile sheetrock, ligh | $55,000 |