Klaus Stoermer Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2008 to Sep 2011
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 7 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2011 | Completed final sign-off Oct 2011 | 2563 Gough St | some dryrot on extg exterior rear stair system of the bldg needs to be repaired. the landings of the stairs need to have joists added to be 16" oc. replacing 16' 4x4 post, stairstringer, treads and joist of redwood structure. no alteration other than repair and treatment of dryrot and adding someDetails
some dryrot on extg exterior rear stair system of the bldg needs to be repaired. the landings of the stairs need to have joists added to be 16" oc. replacing 16' 4x4 post, stairstringer, treads and joist of redwood structure. no alteration other than repair and treatment of dryrot and adding some | $2,000 |