Back to kitchen remodel contractors
Kitchen Experts Of California
- Based in
- Danville
- On San Francisco permits
- Feb 2009 to Mar 2009
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2009 | Completed final sign-off May 2009 | 1426 29th Av | kitchen - 6 under cabinet lights, tile floor, new cabintry & countertop. install appliance including gas range. bathroom - replace tub, tile floor, new vanity.Details
kitchen - 6 under cabinet lights, tile floor, new cabintry & countertop. install appliance including gas range. bathroom - replace tub, tile floor, new vanity. | $39,000 |
| Feb 4, 2009 | Completed final sign-off Dec 2009 | 856 Clayton St | kitchen remodel, laminate flooring, cabinets, countertop area = 7.5'x9.5', bathroom remodel travertine walls and floor new vanity area=7.5'x5', lighting: min. 50% of kitchen lighting wattage shall be of fluorescent. install customer provided kitchen appliances electrical & plumbing connections.Details
kitchen remodel, laminate flooring, cabinets, countertop area = 7.5'x9.5', bathroom remodel travertine walls and floor new vanity area=7.5'x5', lighting: min. 50% of kitchen lighting wattage shall be of fluorescent. install customer provided kitchen appliances electrical & plumbing connections. | $71,700 |