Back to bathroom remodel contractors
King's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2026
- Last 24 months
- 1 permit filed
9 permits since 2000: 7 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 10 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 101 Saint Francis Bl | 2 bathroom remodels inkind, toilet replacement, new vanity cabinet, replace tub, replace tiles.Details
2 bathroom remodels inkind, toilet replacement, new vanity cabinet, replace tub, replace tiles. | $15,000 |
| Apr 2, 2024 | Completed final sign-off May 2024 | 2216 Irving St | change of use from office to pet grooming. install 2 pet shower tubs. install new anti-slip spc flooring. install grab bar in e) bathroom. replace lavatory & toilet in kindDetails
change of use from office to pet grooming. install 2 pet shower tubs. install new anti-slip spc flooring. install grab bar in e) bathroom. replace lavatory & toilet in kind | $5,000 |
| Jun 6, 2017 | Completed final sign-off Dec 2017 | 217 Richland Av | revision to pa 2016-1222-5745 - replace (e) interior staircase in-kind per plan. replace wall insulation on 2nd & 3rd floor. swap sink & toilet location on 3rd floor per plan. add 2 skylights in bathroom on 3rd floor. structural work per planDetails
revision to pa 2016-1222-5745 - replace (e) interior staircase in-kind per plan. replace wall insulation on 2nd & 3rd floor. swap sink & toilet location on 3rd floor per plan. add 2 skylights in bathroom on 3rd floor. structural work per plan | $10,000 |
| Dec 22, 2016 | Completed final sign-off Dec 2017 | 217 Richland Av | 2nd flr upper unit: bearing wall to the remodel (e) living room, & replacing. add new shelves on each side of the fire place. add pocket door between (e) living & family rm. kitchen and bath remodel. add full bath on 3rdDetails
2nd flr upper unit: bearing wall to the remodel (e) living room, & replacing. add new shelves on each side of the fire place. add pocket door between (e) living & family rm. kitchen and bath remodel. add full bath on 3rd | $80,000 |