King's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2026
- Last 24 months
- 1 permit filed
9 permits since 2000: 7 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 101 Saint Francis Bl | 2 bathroom remodels inkind, toilet replacement, new vanity cabinet, replace tub, replace tiles.Details
2 bathroom remodels inkind, toilet replacement, new vanity cabinet, replace tub, replace tiles. | $15,000 |
| Apr 2, 2024 | Completed final sign-off May 2024 | 2216 Irving St | change of use from office to pet grooming. install 2 pet shower tubs. install new anti-slip spc flooring. install grab bar in e) bathroom. replace lavatory & toilet in kindDetails
change of use from office to pet grooming. install 2 pet shower tubs. install new anti-slip spc flooring. install grab bar in e) bathroom. replace lavatory & toilet in kind | $5,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2017 | 1979 08th Av | revision to pa 2017-0123-7686 - window was planning to move but decided to keep in existing location. door removed from original planDetails
revision to pa 2017-0123-7686 - window was planning to move but decided to keep in existing location. door removed from original plan | |
| Jun 6, 2017 | Completed final sign-off Dec 2017 | 217 Richland Av | revision to pa 2016-1222-5745 - replace (e) interior staircase in-kind per plan. replace wall insulation on 2nd & 3rd floor. swap sink & toilet location on 3rd floor per plan. add 2 skylights in bathroom on 3rd floor. structural work per planDetails
revision to pa 2016-1222-5745 - replace (e) interior staircase in-kind per plan. replace wall insulation on 2nd & 3rd floor. swap sink & toilet location on 3rd floor per plan. add 2 skylights in bathroom on 3rd floor. structural work per plan | $10,000 |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 217 Richland Av | to comply nov#201769880- replace six (6) existing vinyl windows at front with new double-hung aluminum clad wood windows. replace fully non-visible windows at rear with vinyl windows.Details
to comply nov#201769880- replace six (6) existing vinyl windows at front with new double-hung aluminum clad wood windows. replace fully non-visible windows at rear with vinyl windows. | $1,800 |
| Jan 23, 2017 | Never finaled issued Mar 2017, no final | 1979 08th Av | kitchen remodel, powder room, den configuration.Details
kitchen remodel, powder room, den configuration. | $95,000 |
| Dec 22, 2016 | Completed final sign-off Dec 2017 | 217 Richland Av | 2nd flr upper unit: bearing wall to the remodel (e) living room, & replacing. add new shelves on each side of the fire place. add pocket door between (e) living & family rm. kitchen and bath remodel. add full bath on 3rdDetails
2nd flr upper unit: bearing wall to the remodel (e) living room, & replacing. add new shelves on each side of the fire place. add pocket door between (e) living & family rm. kitchen and bath remodel. add full bath on 3rd | $80,000 |
| Jun 22, 2016 | Completed final sign-off Oct 2016 | 1681 16th Av | build a new deck on the 2nd floorDetails
build a new deck on the 2nd floor | $8,000 |
| Jun 1, 2016 | Completed final sign-off Oct 2016 | 1681 16th Av | repair (e) deck less than 50%.Details
repair (e) deck less than 50%. | $5,000 |