Back to kitchen remodel contractors
Kin Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Mar 2017
- Last 24 months
- 0 permits filed
12 permits since 2000: 11 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2015 | Completed final sign-off Nov 2015 | 165 Meadowbrook Dr | remodel kitchen/floor tils/countertop/ sink/replace windows not visible from street, u factor 0.32 max. no change to layout. no structural work.Details
remodel kitchen/floor tils/countertop/ sink/replace windows not visible from street, u factor 0.32 max. no change to layout. no structural work. | $15,000 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 1670 Bay St | kitchen remodel, change floor tiles, change countertop, sink, windows(x2), bath remodel, tile, shower remodel, change toilet and sinkDetails
kitchen remodel, change floor tiles, change countertop, sink, windows(x2), bath remodel, tile, shower remodel, change toilet and sink | $9,500 |
| Jan 4, 2012 | Completed final sign-off Aug 2012 | 1406 24th Av | 1st fl: improvement of existing space to have family room, bathroom, storage, furnaces in garage. 2nd fl: remodel kitchen and bath. 1/f wall in light well.Details
1st fl: improvement of existing space to have family room, bathroom, storage, furnaces in garage. 2nd fl: remodel kitchen and bath. 1/f wall in light well. | $53,000 |
| Jan 8, 2010 | Completed final sign-off Jul 2010 | 1434 16th Av | remodel kitchen & 1 bathroom on the top floor-kitchen: counter top, cabinets replacement. bathroom: replace plumbing fixtures & retile floors & walls, exhausts. min 50% kitchen light wattage must be of high efficiency lights. no adding or moving wallDetails
remodel kitchen & 1 bathroom on the top floor-kitchen: counter top, cabinets replacement. bathroom: replace plumbing fixtures & retile floors & walls, exhausts. min 50% kitchen light wattage must be of high efficiency lights. no adding or moving wall | $11,000 |
| Sep 29, 2003 | Completed final sign-off Jan 2004 | 1253 Alemany Bl | replace the interior walls & ceilings with sheetrock & remodel the kitchen. sheetrock work to beDetails
replace the interior walls & ceilings with sheetrock & remodel the kitchen. sheetrock work to be | $18,000 |